Q4 2025 Kinross Gold Corp Earnings Call

Operator: My name is Kate, and I will be your conference operator today. At this time, I would like to welcome everyone to Kinross Gold Fourth Quarter and Year-End 2025 Results Conference Call and Webcast. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question-and-answer session. If you would like to ask a question during this time, simply press star followed by the number one on your telephone keypad. If you would like to withdraw your question, press star one again. Thank you. I would now like to turn the call over to David Shaver, Senior Vice-President. Please go ahead.

Speaker #2: All lines have been placed on mute to prevent any background noise. After the speakers' remarks, there will be a question-and-answer session. If you would like to ask a question during this time, simply press star followed by the number one on your telephone keypad.

Speaker #2: If you would like to withdraw your question, press star one again. Thank you. I would now like to turn the call over to David Shaver, Senior Vice President.

Speaker #2: Please go ahead. Thank you and good morning. With us today, we have Paul Rollinson, CEO from the Kinross Senior Leadership Team, Andrea Freeborough, Claude Schimper, Will Dunford, and Jeff Gold.

David Shaver: Thank you, and good morning. With us today, we have Paul Rollinson, CEO, and from the Kinross senior leadership team, Andrea Freeborough, Claude Schimper, Will Dunford, and Geoffrey Gold. For a complete discussion of the risks and uncertainties which may lead to actual results differing from estimates contained in our forward-looking information, please refer to page 3 of this presentation, our news release dated 18 February 2026, the MD&A for the period ended 31 December 2025, and our most recently filed AIF, all of which are available on our website. I will now turn the call over to Paul.

David Shaver: Thank you, and good morning. With us today, we have Paul Rollinson, CEO, and from the Kinross senior leadership team, Andrea Freeborough, Claude Schimper, Will Dunford, and Geoffrey Gold. For a complete discussion of the risks and uncertainties which may lead to actual results differing from estimates contained in our forward-looking information, please refer to page 3 of this presentation, our news release dated 18 February 2026, the MD&A for the period ended 31 December 2025, and our most recently filed AIF, all of which are available on our website. I will now turn the call over to Paul.

Speaker #2: For a complete discussion of the risks and uncertainties which may lead to actual results differing from estimates contained in our forward-looking information, please refer to page three of this presentation, our news release dated February 18th, 2026, the MD&A for the period ended December 31st, 2025, and our most recently filed AIF, all of which are available on our website.

Speaker #2: I will now turn the call over to Paul.

J. Paul Rollinson: Thanks, David, and thank you all for joining us. This morning, I will provide an overview of our Q4 and full year results, highlight our operations and projects, and discuss our outlook for the business going forward, and review our achievements in sustainability. I will then hand the call over to the team to provide more detail. Looking back, 2025 was another strong year for our business, underpinned by consistent operational and financial performance. We produced just over 2 million ounces and achieved our cost guidance, demonstrating a rigorous focus on cost control. As a result, our margins increased by 66% compared to a 43% increase in the gold price. This margin expansion resulted in record free cash flow generation for our business, with $769 million generated in Q4 and $2.5 billion for the full year.

Paul Rollinson: Thanks, David, and thank you all for joining us. This morning, I will provide an overview of our Q4 and full year results, highlight our operations and projects, and discuss our outlook for the business going forward, and review our achievements in sustainability. I will then hand the call over to the team to provide more detail. Looking back, 2025 was another strong year for our business, underpinned by consistent operational and financial performance. We produced just over 2 million ounces and achieved our cost guidance, demonstrating a rigorous focus on cost control. As a result, our margins increased by 66% compared to a 43% increase in the gold price. This margin expansion resulted in record free cash flow generation for our business, with $769 million generated in Q4 and $2.5 billion for the full year.

Speaker #3: Thanks, David, and thank you all for joining us. This morning, I will provide an overview of our fourth quarter and full-year results. Highlight our operations and projects, and discuss our outlook for the business going forward, and review our achievements in sustainability.

Speaker #3: I will then hand the call over to the team to provide more detail. Looking back, 2025 was another strong year for our business, underpinned by consistent operational and financial performance.

Speaker #3: We produced just over 2 million ounces and achieved our cost guidance, demonstrating a rigorous focus on cost control. As a result, our margins increased by 66%, compared to a 43% increase in the gold price.

Speaker #3: This margin expansion resulted in record free cash flow generation for our business, with $769 million generated in Q4 and $2.5 billion for the full year.

J. Paul Rollinson: This free cash flow strengthened our balance sheet and allowed us to return significant capital in 2025. In addition to returning approximately $1.5 billion of capital to debt and equity holders, we also ended the year with approximately $1 billion of net cash. With respect to operations, Tasiast and Paracatu continued to anchor the portfolio in 2025. Together, they accounted for approximately 1.1 million ounces for the full year, or more than half of our production at strong margins. At Paracatu, full year production of over 600,000 ounces exceeded the midpoint of guidance, with production exceeding 500,000 ounces for the eighth consecutive year. At Tasiast, full year production also exceeded the midpoint of guidance, and the mine was once again our highest margin operation in the portfolio.

Paul Rollinson: This free cash flow strengthened our balance sheet and allowed us to return significant capital in 2025. In addition to returning approximately $1.5 billion of capital to debt and equity holders, we also ended the year with approximately $1 billion of net cash. With respect to operations, Tasiast and Paracatu continued to anchor the portfolio in 2025. Together, they accounted for approximately 1.1 million ounces for the full year, or more than half of our production at strong margins. At Paracatu, full year production of over 600,000 ounces exceeded the midpoint of guidance, with production exceeding 500,000 ounces for the eighth consecutive year. At Tasiast, full year production also exceeded the midpoint of guidance, and the mine was once again our highest margin operation in the portfolio.

Speaker #3: This free cash flow strengthened our balance sheet and allowed us to return significant capital in 2025. In addition to returning approximately $1.5 billion of capital to debt and equity holders, we also ended the year with approximately $1 billion of net cash.

Speaker #3: With respect to operations, Tassius and Pericoteau continue to anchor the portfolio in 2025. Together, they accounted for approximately $1.1 million ounces for the full year, or more than half of our production.

Speaker #3: That's strong margins. At Pericoteau, full-year production of over 600,000 ounces exceeded the midpoint of guidance, with production exceeding 500,000 ounces for the eighth consecutive year.

Speaker #3: At Tassius, full-year production also exceeded the midpoint of guidance, and the mine was once again our highest-margin operation in the portfolio. At La Cueva, we delivered on full-year production guidance and saw strong performance in the fourth quarter.

J. Paul Rollinson: At La Coipa, we delivered on full year production guidance and saw strong performance in Q4. In the US, our assets delivered another solid year of operations, with full year guidance achieved. Turning now to our projects. In 2025, we continued to make excellent progress across our attractive pipeline. In mid-January, we announced that we are proceeding with construction of three high-quality organic growth projects, which will extend mine life and benefit the long-term costs of our US portfolio. Each of these projects demonstrate compelling economics at a range of gold prices and represent a strong case to invest capital to grow the overall value of the business. We also saw notable progress across our broader resource base, with resource additions at several assets, enhancing our strong resource optionality and long-term production outlook. We also continued to advance our two world-class development projects, Great Bear and Lobo-Marte.

Paul Rollinson: At La Coipa, we delivered on full year production guidance and saw strong performance in Q4. In the US, our assets delivered another solid year of operations, with full year guidance achieved. Turning now to our projects. In 2025, we continued to make excellent progress across our attractive pipeline. In mid-January, we announced that we are proceeding with construction of three high-quality organic growth projects, which will extend mine life and benefit the long-term costs of our US portfolio. Each of these projects demonstrate compelling economics at a range of gold prices and represent a strong case to invest capital to grow the overall value of the business. We also saw notable progress across our broader resource base, with resource additions at several assets, enhancing our strong resource optionality and long-term production outlook. We also continued to advance our two world-class development projects, Great Bear and Lobo-Marte.

Speaker #3: In the U.S., our assets delivered another solid year of operations, with full-year guidance achieved. Turning now to our projects, in 2025, we continue to make excellent progress across our attractive pipeline.

Speaker #3: In mid-January, we announced that we are proceeding with the construction of three high-quality organic growth projects, which will extend mine life and benefit the long-term costs of our U.S.

Speaker #3: Each of these projects demonstrates compelling economics at a range of gold prices and represents a strong case to invest capital to grow the overall value of the business.

Speaker #3: We also saw notable progress across our broader resource base, with resource additions at several assets, enhancing our strong resource optionality and long-term production outlook.

Speaker #3: We also continue to advance our two world-class development projects, Great Bear and Lobo-Marte. At Great Bear, surface construction for the AEX is well advanced, and we look forward to starting construction of the exploration decline later this year.

J. Paul Rollinson: At Great Bear, surface construction for the AEX is well advanced, and we look forward to starting construction of the exploration decline later this year. I'm very pleased to report that we were just designated under the Ontario 1P1P process, which Jeff will elaborate more on. For the main project, detailed engineering and permitting continues to advance as we work with the Ontario and federal authorities, including the Impact Assessment Agency of Canada. The third and final phase of the impact statement submission remains on schedule to be filed at the end of this quarter. At Lobo-Marte, we are progressing baseline studies and plan to submit an EIA by Q2, and we look forward to providing a project update later this year. With respect to our outlook, we are reaffirming our stable multi-year production profile.

Paul Rollinson: At Great Bear, surface construction for the AEX is well advanced, and we look forward to starting construction of the exploration decline later this year. I'm very pleased to report that we were just designated under the Ontario 1P1P process, which Jeff will elaborate more on. For the main project, detailed engineering and permitting continues to advance as we work with the Ontario and federal authorities, including the Impact Assessment Agency of Canada. The third and final phase of the impact statement submission remains on schedule to be filed at the end of this quarter. At Lobo-Marte, we are progressing baseline studies and plan to submit an EIA by Q2, and we look forward to providing a project update later this year. With respect to our outlook, we are reaffirming our stable multi-year production profile.

Speaker #3: I'm very pleased to report that we were just designated under the Ontario 1P1P process, which Jeff will elaborate more on. For the main project, detailed engineering and permitting continues to advance as we work with the Ontario and federal authorities, including the Impact Assessment Agency of Canada.

Speaker #3: The third and final phase of the Impact Statement submission remains on schedule to be filed at the end of this quarter. At Lobo Marte, we are progressing baseline studies and plan to submit an EIA by Q2, and we look forward to providing a project update later this year.

Speaker #3: With respect to our outlook, we are reaffirming our stable multi-year production profile. Production of 2 million ounces for 26 and 27 remains consistent with our previous guidance.

J. Paul Rollinson: Production of 2 million ounces for 2026 and 2027 remains consistent with our previous guidance, and we are introducing a new year of production of 2 million ounces for 2028, at which time our new higher-grade US projects are expected to come online, coinciding with higher-grade mining at Tasiast. Together, we expect this will provide an organic offset to cost inflation through grade enhancement within the mine plan. Looking further ahead, we expect production to remain around the 2 million ounce level through the end of the decade, supported by the higher-grade mining at Tasiast, the US projects, open pit extensions at La Coipa, and the startup of Great Bear. As with everyone in the industry, costs are expected to increase compared to 2025, primarily on higher royalties and inflation.

Paul Rollinson: Production of 2 million ounces for 2026 and 2027 remains consistent with our previous guidance, and we are introducing a new year of production of 2 million ounces for 2028, at which time our new higher-grade US projects are expected to come online, coinciding with higher-grade mining at Tasiast. Together, we expect this will provide an organic offset to cost inflation through grade enhancement within the mine plan. Looking further ahead, we expect production to remain around the 2 million ounce level through the end of the decade, supported by the higher-grade mining at Tasiast, the US projects, open pit extensions at La Coipa, and the startup of Great Bear. As with everyone in the industry, costs are expected to increase compared to 2025, primarily on higher royalties and inflation.

Speaker #3: And we are introducing a new year of production of 2 million ounces for 2028, at which time our new higher-grade U.S. projects are expected to come online, coinciding with higher-grade mining at Tassius.

Speaker #3: Together, we expect this will provide an organic offset to cost inflation through grade enhancement within the mine plan. Looking further ahead, we expect production to remain around the 2 million ounce level through the end of the decade, supported by the higher-grade mining at Tasiast, the U.S.

Speaker #3: Projects, open-pit extensions at La Cueva, and the startup of Great Bear. As with everyone in the industry, costs are expected to increase compared to 2025, primarily due to higher royalties and inflation.

Speaker #3: However, I want to stress that we are holding the line on what we can control through continued cost discipline. With respect to future capital allocation plans, we will continue to remain disciplined to ensure that we are investing in our operations to maintain a reliable low-risk business, growing net asset value through continued pipeline development, and strengthening our balance sheet while also returning meaningful capital to shareholders.

J. Paul Rollinson: However, I want to stress that we are holding the line on what we can control through continued cost discipline. With respect to future capital allocation plans, we will continue to remain disciplined to ensure that we are investing in our operations to maintain a reliable, low-risk business, growing net asset value through continued pipeline development, and strengthening our balance sheet, while also returning meaningful capital to shareholders. The outlook for our business remains very robust, and Andrea will speak more on our plans to return capital to shareholders later. Turning to sustainability, in 2025, we continued to advance several priorities across this important area. In Q2, we will publish our annual sustainability report, which will provide a detailed review on our sustainability performance and initiatives throughout 2025.

Paul Rollinson: However, I want to stress that we are holding the line on what we can control through continued cost discipline. With respect to future capital allocation plans, we will continue to remain disciplined to ensure that we are investing in our operations to maintain a reliable, low-risk business, growing net asset value through continued pipeline development, and strengthening our balance sheet, while also returning meaningful capital to shareholders. The outlook for our business remains very robust, and Andrea will speak more on our plans to return capital to shareholders later. Turning to sustainability, in 2025, we continued to advance several priorities across this important area. In Q2, we will publish our annual sustainability report, which will provide a detailed review on our sustainability performance and initiatives throughout 2025.

Speaker #3: The outlook for our business remains very robust, and Andrea will speak more on our plans to return capital to shareholders later. Turning to sustainability, in 2025, we continue to advance several priorities across this important area.

Speaker #3: In Q2, we will publish our annual sustainability report, which will provide a detailed review of our sustainability performance and initiatives throughout 2025. Some highlights from the past year include: Under the heading of Environment, we completed an energy efficiency program, delivering an estimated 1.5% reduction in greenhouse gas emissions through the implementation of more than 30 projects across our sites.

J. Paul Rollinson: Some highlights from the past year include, under the heading of environment, we completed an energy efficiency program, delivering an estimated 1.5% reduction in greenhouse gas emissions through the implementation of more than 30 projects across our sites. Under the heading of social, in Mauritania, we donated medical supplies through our long-standing partnership with Project CURE and Mauritania's Ministry of Health. To date, the program has supported more than 70 health clinics. Under the heading of governance, we were once again named the top-scoring mining company in the Globe and Mail's annual corporate governance ranking, including maintaining placement in the top 15% of companies overall. With that, I will now turn the call over to Andrea.

Paul Rollinson: Some highlights from the past year include, under the heading of environment, we completed an energy efficiency program, delivering an estimated 1.5% reduction in greenhouse gas emissions through the implementation of more than 30 projects across our sites. Under the heading of social, in Mauritania, we donated medical supplies through our long-standing partnership with Project CURE and Mauritania's Ministry of Health. To date, the program has supported more than 70 health clinics. Under the heading of governance, we were once again named the top-scoring mining company in the Globe and Mail's annual corporate governance ranking, including maintaining placement in the top 15% of companies overall. With that, I will now turn the call over to Andrea.

Speaker #3: Under the heading of Social, in Mauritania, we donated medical supplies through our longstanding partnership with Project C.U.R.E. and Mauritania's Ministry of Health. To date, the program has supported more than 70 health clinics.

Speaker #3: And under the heading of Governance, we were once again named the top-scoring mining company in the Globe and Mail's annual corporate governance ranking. Including maintaining placement in the top 15% of companies overall.

Speaker #3: With that, I will now turn the call over to Andrea.

Speaker #4: Thanks, Paul. This morning, I will review our financial highlights from the quarter and full year, provide an overview of our balance sheet, and discuss our capital allocation plans.

Andrea S. Freeborough: Thanks, Paul. This morning, I will review our financial highlights from the quarter and full year, provide an overview of our balance sheet and our capital allocation plans, and discuss our outlook and guidance. We finished the year producing just over 2 million ounces, in line with guidance, with 484,000 ounces produced in Q4. Cost of sales of $1,289 per ounce and all-in sustaining costs of $1,825 per ounce in Q4 were higher compared to the prior quarter, as expected, due to higher gold prices and lower planned production related to mine sequencing.

Andrea Freeborough: Thanks, Paul. This morning, I will review our financial highlights from the quarter and full year, provide an overview of our balance sheet and our capital allocation plans, and discuss our outlook and guidance. We finished the year producing just over 2 million ounces, in line with guidance, with 484,000 ounces produced in Q4. Cost of sales of $1,289 per ounce and all-in sustaining costs of $1,825 per ounce in Q4 were higher compared to the prior quarter, as expected, due to higher gold prices and lower planned production related to mine sequencing.

Speaker #4: And discuss our outlook and guidance. We finished the year producing just over $2 million ounces, in line with guidance, with $484,000 ounces produced in the fourth quarter.

Speaker #4: Cost of sales of $1,289 per ounce and all in sustaining costs of $1,825 per ounce in the fourth quarter were higher compared to the prior quarter, as expected, due to higher gold prices and lower planned production related to mine sequencing.

Speaker #4: Full-year cost of sales of $1,135 per ounce and full-year all-in sustaining costs of $1,571 per ounce were in line with guidance, despite the impact from higher royalties.

Andrea S. Freeborough: Full year cost of sales of $1,035 per ounce and full year all-in sustaining costs of $1,571 per ounce were in line with guidance, despite the impact from higher royalties. Margins were strong at $2,847 per ounce sold in Q4, and $2,283 per ounce for the full year. Our adjusted earnings were $0.67 per share in Q4, and $1.84 per share for the full year. Adjusted operating cash flow was a record $1.1 billion in Q4, and a record $3.6 billion for the full year. Attributable CapEx was $362 million in Q4, and $1.18 billion for the full year, in line with our full year guidance.

Andrea Freeborough: Full year cost of sales of $1,035 per ounce and full year all-in sustaining costs of $1,571 per ounce were in line with guidance, despite the impact from higher royalties. Margins were strong at $2,847 per ounce sold in Q4, and $2,283 per ounce for the full year. Our adjusted earnings were $0.67 per share in Q4, and $1.84 per share for the full year. Adjusted operating cash flow was a record $1.1 billion in Q4, and a record $3.6 billion for the full year. Attributable CapEx was $362 million in Q4, and $1.18 billion for the full year, in line with our full year guidance.

Speaker #4: Margins were strong at $2,847 per ounce sold in Q4 and $2,283 per ounce for the full year. Our adjusted earnings were $0.67 per share in Q4 and $1.84 per share for the full year.

Speaker #4: Adjusted operating cash flow was a record $1.1 billion in Q4 and a record $3.6 billion for the full year. Attributable CapEx was $362 million in Q4 and $1.18 billion for the full year, in line with our full-year guidance.

Speaker #4: Attributable free cash flow was a record $769 million in Q4 and a record $2.5 billion for the full year. Turning to the balance sheet, we continue to strengthen our financial position with significant cash flow generation in 2025, $700 million of debt repayments, and significant growth in our cash position.

Andrea S. Freeborough: Attributable free cash flow was a record $769 million in Q4, and a record $2.5 billion for the full year. Turning to the balance sheet, we continued to strengthen our financial position with significant cash flow generation in 2025, $700 million of debt repayments, and significant growth in our cash position. In Q1, we repaid the remaining $200 million on the term loan we used to fund the acquisition of Great Bear. After redeeming our $500 million dollar 2027 senior notes in December, we ended the year with $1.7 billion in cash, approximately $3.5 billion of total liquidity, and net cash of approximately $1 billion.

Andrea Freeborough: Attributable free cash flow was a record $769 million in Q4, and a record $2.5 billion for the full year. Turning to the balance sheet, we continued to strengthen our financial position with significant cash flow generation in 2025, $700 million of debt repayments, and significant growth in our cash position. In Q1, we repaid the remaining $200 million on the term loan we used to fund the acquisition of Great Bear. After redeeming our $500 million dollar 2027 senior notes in December, we ended the year with $1.7 billion in cash, approximately $3.5 billion of total liquidity, and net cash of approximately $1 billion.

Speaker #4: In Q1, we repaid the remaining $200 million on the term loan we used to fund the acquisition of Great Bear, and after redeeming our $500 million 2027 senior notes in December, we ended the year with $1.7 billion in cash, approximately $3.5 billion of total liquidity, and net cash of approximately $1 billion.

Speaker #4: We now have no near-term debt maturities, with $500 million due in 2033 and $250 million due in 2041. In December, we received a credit rating upgrade from Moody's Investor Services, upgrading our rating to BAA2 from BAA3.

Andrea S. Freeborough: We now have no near-term debt maturities, with $500 million due in 2033, and $250 million due in 2041. In December, we received a credit rating upgrade from Moody's Investors Service, upgrading our rating to Baa2 from Baa3. Also, in December, we renewed our $1.5 billion revolving credit facility, restoring the five-year term. Turning to our guidance and outlook, we're forecasting production in the range of 2 million ounces for 2026, remaining consistent with previous guidance. Production is expected to be relatively evenly split across the year, at approximately 490 to 510 thousand ounces each quarter.

Andrea Freeborough: We now have no near-term debt maturities, with $500 million due in 2033, and $250 million due in 2041. In December, we received a credit rating upgrade from Moody's Investors Service, upgrading our rating to Baa2 from Baa3. Also, in December, we renewed our $1.5 billion revolving credit facility, restoring the five-year term. Turning to our guidance and outlook, we're forecasting production in the range of 2 million ounces for 2026, remaining consistent with previous guidance. Production is expected to be relatively evenly split across the year, at approximately 490 to 510 thousand ounces each quarter.

Speaker #4: Also in December, we renewed our $1.5 billion revolving credit facility, restoring the five-year term. Turning to our guidance and outlook, we're forecasting production in the range of 2 million ounces for 2026, remaining consistent with previous guidance.

Speaker #4: Production is expected to be relatively evenly split across the year, at approximately 490,000 to 510,000 ounces each quarter. With respect to costs this year, we are guiding $1,360 per ounce for cost of sales, and $1,730 per ounce for all-in sustaining costs, at a gold price of $4,500 per ounce.

Andrea S. Freeborough: With respect to cost this year, we are guiding $1,360 per ounce for cost of sales, and $1,730 per ounce for all-in sustaining costs at a gold price of $4,500 per ounce. The expected increase of 10% for all-in sustaining costs compared to 2025 is driven by three factors. First, higher royalty costs due to higher gold prices, resulting in an approximate impact of 4% or $55 per ounce. Second, overall cost inflation of approximately 5% or $75 per ounce, and the remaining 1% is primarily related to mine plan sequencing across the portfolio. With the increase in costs largely related to non-controllable factors, our cost guidance continues to demonstrate our effective cost management strategy.

Andrea Freeborough: With respect to cost this year, we are guiding $1,360 per ounce for cost of sales, and $1,730 per ounce for all-in sustaining costs at a gold price of $4,500 per ounce. The expected increase of 10% for all-in sustaining costs compared to 2025 is driven by three factors. First, higher royalty costs due to higher gold prices, resulting in an approximate impact of 4% or $55 per ounce. Second, overall cost inflation of approximately 5% or $75 per ounce, and the remaining 1% is primarily related to mine plan sequencing across the portfolio. With the increase in costs largely related to non-controllable factors, our cost guidance continues to demonstrate our effective cost management strategy.

Speaker #4: The expected increase of 10% for all-in sustaining costs compared to 2025 is driven by three factors. First, higher royalty costs due to higher gold prices, resulting in an approximate impact of 4%, or $55 per ounce.

Speaker #4: Second, overall cost inflation of approximately 5%, or $75 per ounce. And the remaining 1% is primarily related to mine plant sequencing across the portfolio.

Speaker #4: With the increase in costs largely related to non-controllable factors, our cost guidance continues to demonstrate our effective cost management strategy. Our capital expenditure guidance of $1.5 billion for 2026 reflects annual inflation and planned higher capital investment as we reinvest more in our business to extend mine lives and increase production in the late 2020s and 2030s.

Andrea S. Freeborough: Our capital expenditure guidance of $1.5 billion for 2026 reflects annual inflation and planned higher capital investment as we reinvest more in our business to extend mine life and increase production in the late 2020s and 2030. Approximately $1.05 billion of our total CapEx is expected to be non-sustaining, with the remaining $450 million expected to be sustaining capital. Looking ahead, our production guidance of 2 million ounces remains unchanged for 2027, and we have now added another year, 2028, to our stable 2 million ounce profile. Capital expenditures for 2027 and 2028 are expected to be approximately in line with 2026, subject to ongoing inflation and potential other project opportunities for the 2030 that are currently under study.

Andrea Freeborough: Our capital expenditure guidance of $1.5 billion for 2026 reflects annual inflation and planned higher capital investment as we reinvest more in our business to extend mine life and increase production in the late 2020s and 2030. Approximately $1.05 billion of our total CapEx is expected to be non-sustaining, with the remaining $450 million expected to be sustaining capital. Looking ahead, our production guidance of 2 million ounces remains unchanged for 2027, and we have now added another year, 2028, to our stable 2 million ounce profile. Capital expenditures for 2027 and 2028 are expected to be approximately in line with 2026, subject to ongoing inflation and potential other project opportunities for the 2030 that are currently under study.

Speaker #4: Approximately $1.05 billion of our total CapEx is expected to be non-sustaining, with the remaining $450 million expected to be sustaining capital. Looking ahead, our production guidance of 2 million ounces remains unchanged for 2027, and we have now added another year, 2028, to our stable 2 million ounce profile.

Speaker #4: Capital expenditures for 2027 and 2028 are expected to be approximately in line with 2026, subject to ongoing inflation and potential other project opportunities for the 2030s that are currently under study.

Speaker #4: As Paul noted, we will maintain our disciplined capital allocation strategy. Which includes reinvesting in our business, where we have chosen to increase capital expenditures by $350 million this year, continuing to strengthen our investment-grade balance sheet, and returning meaningful capital to shareholders.

Andrea S. Freeborough: As Paul noted, we will maintain our disciplined capital allocation strategy, which includes reinvesting in our business, where we have chosen to increase capital expenditures by $350 million this year, continuing to strengthen our investment-grade balance sheet, and returning meaningful capital to shareholders. This year, we are targeting to return approximately 40% of our free cash flow back to shareholders through both dividends and share repurchases. Our shares remain a strong return on invested capital, considering our attractive valuation and free cash flow yield. With respect to dividends, we are further increasing our dividend by $0.02 per share annually, or 14%, following a 17% increase we announced in Q4, for a total increase of 33%.

Andrea Freeborough: As Paul noted, we will maintain our disciplined capital allocation strategy, which includes reinvesting in our business, where we have chosen to increase capital expenditures by $350 million this year, continuing to strengthen our investment-grade balance sheet, and returning meaningful capital to shareholders. This year, we are targeting to return approximately 40% of our free cash flow back to shareholders through both dividends and share repurchases. Our shares remain a strong return on invested capital, considering our attractive valuation and free cash flow yield. With respect to dividends, we are further increasing our dividend by $0.02 per share annually, or 14%, following a 17% increase we announced in Q4, for a total increase of 33%.

Speaker #4: This year, we are targeting to return approximately 40% of our free cash flow back to shareholders through both dividends and share repurchases. Our shares remain a strong return on invested capital, considering our attractive valuation and free cash flow yields.

Speaker #4: With respect to dividends, we are further increasing our dividend by $0.02 per share annually, or 14%, following a 17% increase we announced in Q4, for a total increase of 33%.

Speaker #4: Also, as a reminder, as typical for us, we expect Q1 to be a higher cash outflow quarter due to annual tax payments in Brazil and Mauritania, and semi-annual interest payments on the remaining senior notes.

Andrea S. Freeborough: Also, as a reminder, as typical for us, we expect Q1 to be a higher cash outflow quarter due to annual tax payments in Brazil and Mauritania, and semiannual interest payments on the remaining senior notes. We expect to start executing our share buyback program next week. I'll now turn the call over to Claude to discuss our operations.

Andrea Freeborough: Also, as a reminder, as typical for us, we expect Q1 to be a higher cash outflow quarter due to annual tax payments in Brazil and Mauritania, and semiannual interest payments on the remaining senior notes. We expect to start executing our share buyback program next week. I'll now turn the call over to Claude to discuss our operations.

Speaker #4: We expect to start executing our share buyback program next week. I'll now turn the call over to Claude to discuss our operations.

Speaker #5: Thank you, Andrea. I'd like to start with our safety culture. In the fourth quarter, our risk management practices continue to be strengthened across all the assets.

Claude Schimper: Thank you, Andrea. I'd like to start with our safety culture. In Q4, our risk management practices continued to be strengthened across all the assets, ensuring that our highest risk activities are consistently and effectively controlled in the field. Building on our safety excellence programs, we continue to enhance capability at the frontline by investing in our field supervisors, equipping them with practical tools, targeted training, and visible leadership expectations to improve the quality of our critical control verifications. In December, we signed a five-year collective labor agreement at Tasiast, and a two-year CLA at La Coipa, reflecting our ongoing partnership with our employees and ensuring stability for both the local workforce and our businesses in Mauritania and Chile. Our culture of operational excellence, which is backed by dedicated site teams, continues to drive strong performance from our operations.

Claude Schimper: Thank you, Andrea. I'd like to start with our safety culture. In Q4, our risk management practices continued to be strengthened across all the assets, ensuring that our highest risk activities are consistently and effectively controlled in the field. Building on our safety excellence programs, we continue to enhance capability at the frontline by investing in our field supervisors, equipping them with practical tools, targeted training, and visible leadership expectations to improve the quality of our critical control verifications. In December, we signed a five-year collective labor agreement at Tasiast, and a two-year CLA at La Coipa, reflecting our ongoing partnership with our employees and ensuring stability for both the local workforce and our businesses in Mauritania and Chile. Our culture of operational excellence, which is backed by dedicated site teams, continues to drive strong performance from our operations.

Speaker #5: Ensuring that our highest-risk activities are consistently and effectively controlled in the field. Building on our safety excellence programs, we continue to enhance capability at the front line by investing in our field supervisors, equipping them with practical tools, targeted training, and visible leadership expectations, to improve the quality of our critical control verifications.

Speaker #5: In December, we signed a five-year collective labor agreement at Tasias, and a two-year CLA at La Cueva, reflecting our ongoing partnership with our employees.

Speaker #5: And ensuring stability for both the local workforce and our businesses in Mauritania and Chile. Our culture of operational excellence, which is backed by dedicated site teams, continues to drive strong performance from our operations.

Speaker #5: Beginning with Paraca2, the mine delivered another strong year of production exceeding $600,000 ounces, resulting in significant cash flow. Full-year production of $601,000 ounces, exceeded the midpoint of guidance, and cost of sales of $978 per ounce was below the midpoint of guidance.

Claude Schimper: Beginning with Paracatu, the mine delivered another strong year of production, exceeding 600,000 ounces, resulting in significant cash flow. Full-year production of 601,000 ounces exceeded the midpoint of guidance, and cost of sales of $978 per ounce was below the midpoint of guidance. Production of 155,000 ounces in Q4 increased over the prior quarter due to timing of ounces processed through the mill, partially offsetting lower planned throughput. Paracatu is expected to produce 600,000 ounces at a cost of sales of $1,240 per ounce in 2026. Tasiast delivered another strong year of operations, with full-year production of 503,000 ounces at a cost of sales of $884 per ounce, both meeting guidance....

Claude Schimper: Beginning with Paracatu, the mine delivered another strong year of production, exceeding 600,000 ounces, resulting in significant cash flow. Full-year production of 601,000 ounces exceeded the midpoint of guidance, and cost of sales of $978 per ounce was below the midpoint of guidance. Production of 155,000 ounces in Q4 increased over the prior quarter due to timing of ounces processed through the mill, partially offsetting lower planned throughput. Paracatu is expected to produce 600,000 ounces at a cost of sales of $1,240 per ounce in 2026. Tasiast delivered another strong year of operations, with full-year production of 503,000 ounces at a cost of sales of $884 per ounce, both meeting guidance....

Speaker #5: Production of 155,000 ounces in the fourth quarter increased over the prior quarter, due to timing of ounces processed through the mill, partially offsetting lower planned throughput.

Speaker #5: Paraca2 is expected to produce 600,000 ounces at a cost of sales of $1,240 per ounce in 2026. Tasias delivered another strong year of operations, with full-year production of 503,000 ounces at a cost of sales of $884 per ounce, both meeting guidance.

Claude Schimper: Tasiast was once again our lowest cost operation in 2025, delivering robust cash flow. In Q4, the site delivered 126,000 ounces at a cost of sales of $1,002 per ounce. Production was higher over the prior quarter due to higher grades and stronger throughput. Production is expected to be slightly higher in 2026 and 2027 compared to the technical report, due to ongoing mine plan optimization. The site is expected to maintain production at around the 500,000 ounce level, until we are back into higher grades in 2028. In 2026, Tasiast is expected to deliver 505,000 ounces, with a target cost of sales of $1,050 per ounce, and is expected to be our lowest cost operation once again this year.

Claude Schimper: Tasiast was once again our lowest cost operation in 2025, delivering robust cash flow. In Q4, the site delivered 126,000 ounces at a cost of sales of $1,002 per ounce. Production was higher over the prior quarter due to higher grades and stronger throughput. Production is expected to be slightly higher in 2026 and 2027 compared to the technical report, due to ongoing mine plan optimization. The site is expected to maintain production at around the 500,000 ounce level, until we are back into higher grades in 2028. In 2026, Tasiast is expected to deliver 505,000 ounces, with a target cost of sales of $1,050 per ounce, and is expected to be our lowest cost operation once again this year.

Speaker #5: Tasias was once again our lowest-cost operation in 2025, delivering robust cash flow. In the fourth quarter, the site delivered 126,000 ounces, at a cost of sales of $1,002 per ounce.

Speaker #5: Production was higher over the prior quarter, due to higher grades and stronger throughput. Production is expected to be slightly higher in 2026 and 2027, compared to the technical report, due to ongoing mine plan optimization.

Speaker #5: The site is expected to maintain production at around the 500,000-ounce level, until we are back into higher grades, in 2028. In 2026, Tasias is expected to deliver 505,000 ounces, with a target cost of sales of $1,050 per ounce, and is expected to be our lowest-cost operation once again this year.

Speaker #5: La Cueva delivered a strong final quarter, with production of 67,000 ounces, improving over the prior quarter, on higher mill throughput. Full-year production of 232,000 ounces, was in line with guidance.

Claude Schimper: Coipa delivered a strong final quarter with production of 67,000 ounces, improving over the prior quarter on higher mill throughput. Full year production of 232,000 ounces was in line with guidance. In 2026, mining at La Coipa will continue to take place at the two open pits, Phase 7 and Furen, and blend the ore feed into the process plant. La Coipa is anticipated to produce 210,000 ounces at a cost of sales of $1,320 per ounce in 2026. Our US assets collectively delivered full year production of 676,000 ounces at a cost of sales of $1,426 per ounce, in line with guidance. Production of 136,000 ounces in the final quarter was on plan.

Claude Schimper: Coipa delivered a strong final quarter with production of 67,000 ounces, improving over the prior quarter on higher mill throughput. Full year production of 232,000 ounces was in line with guidance. In 2026, mining at La Coipa will continue to take place at the two open pits, Phase 7 and Furen, and blend the ore feed into the process plant. La Coipa is anticipated to produce 210,000 ounces at a cost of sales of $1,320 per ounce in 2026. Our US assets collectively delivered full year production of 676,000 ounces at a cost of sales of $1,426 per ounce, in line with guidance. Production of 136,000 ounces in the final quarter was on plan.

Speaker #5: In 2026, mining at La Cueva will continue to take place at the two open pits, Phase 7 and Puren, and blend the ore feed into the process plant.

Speaker #5: La Cueva is anticipated to produce 210,000 ounces, at a cost of sales of $1,320 per ounce, in 2026. Our US assets collectively delivered full-year production of 676,000 ounces, at a cost of sales of $1,426 per ounce, in line with guidance.

Speaker #5: Production of 136,000 ounces in the final quarter was on plan. In Alaska, fourth-quarter production of 65,000 ounces was lower compared to the prior quarter, and cost of sales of $1,673 per ounce was higher, as a result of planned mine sequencing, including lower contributions from Mancho.

Claude Schimper: In Alaska, Q4 production of 65,000 ounces was lower compared to the prior quarter, and cost of sales of $1,673 per ounce was higher as a result of planned mine sequencing, including lower contributions from Manh Choh. At Bald Mountain, we produced 38,000 ounces at a cost of sales of $1,492 per ounce, and production was lower over the prior quarter, while costs were higher due to planned mining of lower grade areas at the Galaxy and Royale pits. At Round Mountain, production of 32,000 ounces was lower compared to the prior quarter, as Phase S continued to transition into initial ore, while processing from lower grade stockpiles, resulting in a higher cost per ounce sold. With that, I'll now pass the call over to William to discuss our resource update and projects.

Claude Schimper: In Alaska, Q4 production of 65,000 ounces was lower compared to the prior quarter, and cost of sales of $1,673 per ounce was higher as a result of planned mine sequencing, including lower contributions from Manh Choh. At Bald Mountain, we produced 38,000 ounces at a cost of sales of $1,492 per ounce, and production was lower over the prior quarter, while costs were higher due to planned mining of lower grade areas at the Galaxy and Royale pits. At Round Mountain, production of 32,000 ounces was lower compared to the prior quarter, as Phase S continued to transition into initial ore, while processing from lower grade stockpiles, resulting in a higher cost per ounce sold. With that, I'll now pass the call over to William to discuss our resource update and projects.

Speaker #5: At Bald Mountain, we produced 38,000 ounces at a cost of sales of $1,492 per ounce. Production was lower over the prior quarter, while costs were higher due to planned mining of lower-grade areas at the Galaxy and Royale pits.

Speaker #5: At Round Mountain, production of 32,000 ounces was lower compared to the prior quarter, as Phase S continued to transition into initial ore, while processing from lower-grade stockpiles resulting in a higher cost per ounce sold.

Speaker #5: With that, I'll now pass the call over to William to discuss our resource update and projects.

Speaker #6: Thanks, Claude. I will start by providing an update on our year-end reserve and resource. For this year, we have updated our reserve price to $2,000 per ounce, and our resource price to $2,500 per ounce.

William D. Dunford: Thanks, Claude. I will start by providing an update on our year-end reserve and resource. For this year, we have updated our reserve price to $2,000 per ounce and our resource price to $2,500 per ounce. The intention was to be more reflective of the recent gold price environment, while still maintaining discipline and a focus on strong margins. Starting with reserves, I'm pleased to report that we added approximately 1.2 million ounces of reserve before depletion. At Paracatu, we saw a 700,000-ounce addition, largely offsetting depletion through mine design optimization and successful near mine exploration. At Bald Mountain, we added 200,000 ounces before depletions, primarily through conversion of resources to reserves at the five satellite pits that were approved as part of the Redbird 2 project.

William D. Dunford: Thanks, Claude. I will start by providing an update on our year-end reserve and resource. For this year, we have updated our reserve price to $2,000 per ounce and our resource price to $2,500 per ounce. The intention was to be more reflective of the recent gold price environment, while still maintaining discipline and a focus on strong margins. Starting with reserves, I'm pleased to report that we added approximately 1.2 million ounces of reserve before depletion. At Paracatu, we saw a 700,000-ounce addition, largely offsetting depletion through mine design optimization and successful near mine exploration. At Bald Mountain, we added 200,000 ounces before depletions, primarily through conversion of resources to reserves at the five satellite pits that were approved as part of the Redbird 2 project.

Speaker #6: The intention was to be more reflective of the recent gold price environment, while still maintaining discipline and a focus on strong margins. Starting with reserves, I'm pleased to report that we added approximately 1.2 million ounces of reserve before depletion.

Speaker #6: At Paraca2, we saw a $700,000 ounce addition, largely offsetting depletion, through mine design optimization and successful near-mine exploration. At Bald Mountain, we added $200,000 ounces before depletion, primarily through conversion of resources to reserves at the five satellite pits that were approved as part of the Red Bird II project.

Speaker #6: At Tasias, we added $200,000 ounces before depletion, with additions both at West Branch and the existing pit design, and at the Fennec satellite pit.

William D. Dunford: At Tasiast, we added 200,000 ounces before depletion, with additions both at West Branch in the existing pit design and at the Fenix satellite pit. At Round Mountain, the transition to underground replaced just over 1 million ounces of lower margin, lower grade, open-pit reserves, with approximately 1.2 million ounces of higher grade, higher margin, underground reserves, fully offsetting our depletion. We are pleased to continue to see this type of progress in our reserve base, extending mine life as we advance exploration, optimizations, and project studies across the portfolio. We have also grown our resource base by 1.6 million ounces of M&I, and 3.4 million ounces of inferred.

William D. Dunford: At Tasiast, we added 200,000 ounces before depletion, with additions both at West Branch in the existing pit design and at the Fenix satellite pit. At Round Mountain, the transition to underground replaced just over 1 million ounces of lower margin, lower grade, open-pit reserves, with approximately 1.2 million ounces of higher grade, higher margin, underground reserves, fully offsetting our depletion. We are pleased to continue to see this type of progress in our reserve base, extending mine life as we advance exploration, optimizations, and project studies across the portfolio. We have also grown our resource base by 1.6 million ounces of M&I, and 3.4 million ounces of inferred.

Speaker #6: At Round Mountain, the transition to underground replaced just over $1 million ounces of lower margin, lower grade, open-pit reserves, with approximately $1.2 million ounces of higher grade, higher margin, underground reserves.

Speaker #6: Fully offsetting our depletion. We are pleased to continue to see this type of progress in our reserve base, extending mine life as we advance exploration, optimizations, and project studies across the portfolio.

Speaker #6: We have also grown our resource base by $1.6 million ounces of M&I and $3.4 million ounces of deferred. These resource additions were spread across our portfolio and were reflective of both exploration success and the impact of higher gold prices, as we continue to hold the line on cost.

William D. Dunford: These resource additions were spread across our portfolio and were reflective of both exploration success and the impact of higher gold prices as we continue to hold the line on cost, increasing the size of potential future open-pit laybacks at some assets. Just as we are holding the line on costs, we are also holding the line on our cut-off grades to ensure we maintain the margin and quality of our resource, and only saw a small resource addition from additional mill feed at the end of mine life at the higher gold price. We are pleased to see these strong additions to enhance our long-term resource optionality. You can see on this slide a summary of that significant resource optionality, which now includes 27 million ounces of M&I and approximately 17 million ounces of inferred.

William D. Dunford: These resource additions were spread across our portfolio and were reflective of both exploration success and the impact of higher gold prices as we continue to hold the line on cost, increasing the size of potential future open-pit laybacks at some assets. Just as we are holding the line on costs, we are also holding the line on our cut-off grades to ensure we maintain the margin and quality of our resource, and only saw a small resource addition from additional mill feed at the end of mine life at the higher gold price. We are pleased to see these strong additions to enhance our long-term resource optionality. You can see on this slide a summary of that significant resource optionality, which now includes 27 million ounces of M&I and approximately 17 million ounces of inferred.

Speaker #6: Increasing the size of potential future open-pit laybacks at some assets. Just as we are holding the line on costs, we are also holding the line on our cut-off grades to ensure we maintain the margin and quality of our resource.

Speaker #6: And only saw a small resource addition from additional mill feed at the end of mine life, at the higher gold price. We are pleased to see these strong additions to enhance our long-term resource optionality.

Speaker #6: You can see on this slide a summary of that significant resource optionality. Which now includes 27 million ounces of M&I and approximately 17 million ounces of inferred.

Speaker #6: These resources, which include a number of projects across our operating and development sites, form the pipeline of potential opportunities that we are progressing to support our production profile through the end of the decade and into the 2030s.

William D. Dunford: These resources, which include a number of projects across our operating and development sites, form the pipeline of potential opportunities that we are progressing to support our production profile through the end of the decade and into the 2030s. Our January announcement of progression to construction across three high return projects in the US, is a great example, demonstrating the depth and quality of this significant resource base, and how we are progressing these projects into our business plan. Phase X at Round Mountain is a low-cost, bulk tonnage, underground opportunity that extends operations through 2038, with average annual production of approximately 148,000 ounces. Curlew is a high-grade underground opportunity that leverages existing infrastructure at the Kettle River Mill and at the historic Curlew Mine, to bring online an additional high-margin mine, produces up to 100,000 ounces per year.

William D. Dunford: These resources, which include a number of projects across our operating and development sites, form the pipeline of potential opportunities that we are progressing to support our production profile through the end of the decade and into the 2030s. Our January announcement of progression to construction across three high return projects in the US, is a great example, demonstrating the depth and quality of this significant resource base, and how we are progressing these projects into our business plan. Phase X at Round Mountain is a low-cost, bulk tonnage, underground opportunity that extends operations through 2038, with average annual production of approximately 148,000 ounces. Curlew is a high-grade underground opportunity that leverages existing infrastructure at the Kettle River Mill and at the historic Curlew Mine, to bring online an additional high-margin mine, produces up to 100,000 ounces per year.

Speaker #6: Our January announcement of progression to construction across three high-return projects in the U.S. is a great example, demonstrating the depth and quality of this significant resource base, and how we are progressing these projects into our business plan.

Speaker #6: Phase X at Round Mountain is a low-cost, bulk tonnage, underground opportunity that extends operations through 2038, with average annual production of approximately 140,000 ounces.

Speaker #6: Curlew is a high-grade underground opportunity that leverages existing infrastructure at the Kettle River Mill and at the historic Curlew Mine, to bring online an additional high-margin mine that produces up to 100,000 ounces per year.

Speaker #6: And the Red Bird II project is a highly efficient extension of mining at Bald Mountain, providing the next anchor pit alongside five satellite pits that, combined, deliver 640,000 ounces.

William D. Dunford: The Redbird 2 project is a highly efficient extension of mining at Bald Mountain, providing the next anchor pits, alongside five satellite pits that combines to deliver 640,000 ounces. We have progressed to construction across these three projects on the back of strong margins, with an average AISC of $1,660 per ounce, quick paybacks of less than 2 years, combined NPV of $4.3 billion, and combined IRR of 59% at $4,500 gold. Together, they are expected to add over 3 million ounces of production just based on the initial resource and mine plan inventory we have drilled to date. We are excited to be moving ahead with three high-quality projects as we continue to execute our portfolio of grade enhancement strategy.

William D. Dunford: The Redbird 2 project is a highly efficient extension of mining at Bald Mountain, providing the next anchor pits, alongside five satellite pits that combines to deliver 640,000 ounces. We have progressed to construction across these three projects on the back of strong margins, with an average AISC of $1,660 per ounce, quick paybacks of less than 2 years, combined NPV of $4.3 billion, and combined IRR of 59% at $4,500 gold. Together, they are expected to add over 3 million ounces of production just based on the initial resource and mine plan inventory we have drilled to date. We are excited to be moving ahead with three high-quality projects as we continue to execute our portfolio of grade enhancement strategy.

Speaker #6: We have progressed the construction across these three projects on the back of strong margins with an average ASIC of $1,660 per ounce, quick paybacks of less than two years, combined NPV of $4.3 billion, and combined IRR of 59% at $4,500 gold.

Speaker #6: Together, they are expected to add over $3 million ounces of production, just based on the initial resource and mine plan inventory we have drilled to date.

Speaker #6: We are excited to be moving ahead with three high-quality projects as we continue to execute our portfolio of grade enhancement strategy. Beyond our initial life of mines at Phase X and Curlew, which go out to 2038, both projects have significant potential for mine life extension down dip to further enhance our return and asset value.

William D. Dunford: Beyond our initial life of mines at Phase X and Curlew, which go out to 2038, both projects have significant potential for mine life extensions down dip to further enhance our return on asset value. At Phase X, we have recently completed drilling 220m down dip, which has demonstrated that the mineralization continues with similar strong width and grade, providing further confirmation of our hypothesis that this system extends significantly down dip. This mineralization provides potential for both mine life extensions and for mining rate increase through opening of more mining horizons, potentially increasing the production rates. At Curlew, Stealth and Roadrunner exploration development completed last year has provided drilling access to target wide, high-grade resource extensions in these areas to augment our production profile in the mid-30s, and drilling is now underway.

William D. Dunford: Beyond our initial life of mines at Phase X and Curlew, which go out to 2038, both projects have significant potential for mine life extensions down dip to further enhance our return on asset value. At Phase X, we have recently completed drilling 220m down dip, which has demonstrated that the mineralization continues with similar strong width and grade, providing further confirmation of our hypothesis that this system extends significantly down dip. This mineralization provides potential for both mine life extensions and for mining rate increase through opening of more mining horizons, potentially increasing the production rates. At Curlew, Stealth and Roadrunner exploration development completed last year has provided drilling access to target wide, high-grade resource extensions in these areas to augment our production profile in the mid-30s, and drilling is now underway.

Speaker #6: At Phase X, we have recently completed drilling 220 meters down dip, which has demonstrated that the mineralization continues, with similar strong width and grade.

Speaker #6: Providing further confirmation of our hypothesis that this system extends significantly down dip. This mineralization provides potential for both mine life extensions and for mining rate increase, through opening of more mining horizons, potentially increasing the production rate.

Speaker #6: At Curlew, stealth and Roadrunner exploration development completed last year has provided drilling access to target-wide, high-grade resource extensions in these areas to augment our production profile in the mid-30s and drilling is now underway.

Speaker #6: As you can see on the slide, we have seen strong intercepts outside of the current resource and mine plan inventory in both of these zones, with good widths and grades that have potential to extend the mine life and enhance the margins of the asset.

William D. Dunford: As you can see on the slide, we have seen strong intercepts outside of the current resource and mine plan inventory in both of these zones, with good widths and grades that have potential to extend the mine life and enhance the margins of the asset. Exploration will continue to be a priority for these two sites, and we look forward to providing further drilling updates through 2026. With these three projects now progressing to construction, expected to come online in 2028, our focus is now shifting to adding value accretive production in the 2030s. This slide shows a summary of some of the longer-term projects in that extensive resource base that are our next focus to progress. I'll come back to an update on Great Bear, which is next in line shortly.

William D. Dunford: As you can see on the slide, we have seen strong intercepts outside of the current resource and mine plan inventory in both of these zones, with good widths and grades that have potential to extend the mine life and enhance the margins of the asset. Exploration will continue to be a priority for these two sites, and we look forward to providing further drilling updates through 2026. With these three projects now progressing to construction, expected to come online in 2028, our focus is now shifting to adding value accretive production in the 2030s. This slide shows a summary of some of the longer-term projects in that extensive resource base that are our next focus to progress. I'll come back to an update on Great Bear, which is next in line shortly.

Speaker #6: Exploration will continue to be a priority for these two sites, and we look forward to providing further drilling updates through 2026. With these three projects now progressing to construction, expected to come online in 2028, our focus has now shifting to adding value of creative production in the 2030s.

Speaker #6: This slide shows a summary of some of the longer-term projects in that extensive resource base, that are our next focus to progress. I'll come back to an update on Great Bear, which is next in line shortly.

Speaker #6: Moving across to Chile, a Lobo Marte project team continues to advance technical work, as well as baseline studies to support our upcoming EIA submission.

William D. Dunford: Moving across to Chile, at Lobo-Marte, project team continues to advance technical work as well as baseline studies to support our upcoming EIA submission, and we look forward to providing a project update later this year. At Tasiast, we continue to see positive results down dip at West Branch and are studying both open pit and underground optionality there for mine life extensions in the thirties. At the same time, we are continuing to progress exploration on satellite opportunities similar to Fenix, which we added to the production profile last year and where we saw further reserve growth this year. At Maricunga, this year, we will be progressing technical and baseline studies and refreshing the mine plan to refine our view, given the extensive resource base.

William D. Dunford: Moving across to Chile, at Lobo-Marte, project team continues to advance technical work as well as baseline studies to support our upcoming EIA submission, and we look forward to providing a project update later this year. At Tasiast, we continue to see positive results down dip at West Branch and are studying both open pit and underground optionality there for mine life extensions in the thirties. At the same time, we are continuing to progress exploration on satellite opportunities similar to Fenix, which we added to the production profile last year and where we saw further reserve growth this year. At Maricunga, this year, we will be progressing technical and baseline studies and refreshing the mine plan to refine our view, given the extensive resource base.

Speaker #6: And we look forward to providing a project update later this year. At Tasias, we continue to see positive results down dip at West Branch.

Speaker #6: And we are studying both open-pit and underground optionality there for mine life extensions in the '30s. At the same time, we are continuing to progress exploration on satellite opportunities similar to Fennec, which we added to the production profile last year, and where we saw further reserve growth this year.

Speaker #6: At Mariconga, this year we will be progressing technical and baseline studies and refreshing the mine plan to refine our view given the extent of resource base.

Speaker #6: Beyond these projects, we are continuing to progress exploration and studies for open-pit layback opportunities that you can see in our resource base, across our portfolio, with a strong focus on Perek II, Fort Knox, and Lakota extensions.

William D. Dunford: Beyond these projects, we are continuing to progress exploration and studies for open pit layback opportunities that you can see in our resource base across our portfolio, with a strong focus on Paracatu, Fort Knox, and La Coipa extensions. Now moving to Great Bear. Both the AEX program and main project are progressing well, with the main project on schedule for first production later in 2029, subject to permitting. Starting with updates on AEX, we made strong progress on site construction. Surface construction for AEX is 80% complete. As Paul noted, we look forward to construction of the exploration decline later this year, pending receipt of provincial permits, which Jeff will comment on shortly. With respect to the main project, which remains on track, detailed engineering and technical work continue to advance well, with detailed engineering now approximately 35% complete.

William D. Dunford: Beyond these projects, we are continuing to progress exploration and studies for open pit layback opportunities that you can see in our resource base across our portfolio, with a strong focus on Paracatu, Fort Knox, and La Coipa extensions. Now moving to Great Bear. Both the AEX program and main project are progressing well, with the main project on schedule for first production later in 2029, subject to permitting. Starting with updates on AEX, we made strong progress on site construction. Surface construction for AEX is 80% complete. As Paul noted, we look forward to construction of the exploration decline later this year, pending receipt of provincial permits, which Jeff will comment on shortly. With respect to the main project, which remains on track, detailed engineering and technical work continue to advance well, with detailed engineering now approximately 35% complete.

Speaker #6: Now moving to Great Bear, both the AX program and main project are progressing well, with the main project on schedule for first production later in 2029, subject to permitting.

Speaker #6: Starting with updates on AX, we made strong progress on site construction. Surface construction for AX is 80% complete. As Paul noted, we look forward to construction of the exploration decline later this year, pending receipt of provincial permits, which Jeff will comment on shortly.

Speaker #6: With respect to the main project, which remains on track, detailed engineering and technical work continue to advance well, with detailed engineering now approximately 35% complete.

Speaker #6: Initial major equipment procurement for process plant and surface infrastructure is already underway, with contract awards in progress. Manufacturing of selected long-lead items is anticipated to commence later this year.

William D. Dunford: Initial major equipment procurement for process plant and surface infrastructure is already underway, with contract awards in progress. Manufacturing of selected long lead items is anticipated to commence later this year. With respect to exploration at Great Bear, in 2025, our efforts shifted to focus on regional exploration on the 120 sq km land package. Depot drilling completed up to 1.8 km along strike of the main LP Zone, returned encouraging results, indicating high-grade mineralization beyond the current resource base. Drilling on the broader land package outside of the main LP Zone trend also returned encouraging results. We will progress additional drilling to follow up on these results along trend and on the broader land package this year. I'll now hand it over to Jeff to discuss the permitting progress at Great Bear.

William D. Dunford: Initial major equipment procurement for process plant and surface infrastructure is already underway, with contract awards in progress. Manufacturing of selected long lead items is anticipated to commence later this year. With respect to exploration at Great Bear, in 2025, our efforts shifted to focus on regional exploration on the 120 sq km land package. Depot drilling completed up to 1.8 km along strike of the main LP Zone, returned encouraging results, indicating high-grade mineralization beyond the current resource base. Drilling on the broader land package outside of the main LP Zone trend also returned encouraging results. We will progress additional drilling to follow up on these results along trend and on the broader land package this year. I'll now hand it over to Jeff to discuss the permitting progress at Great Bear.

Speaker #6: With respect to exploration at Great Bear, in 2025 our efforts shifted to focus on regional exploration on the 120 square kilometer land package. Depot drilling completed up to 1.8 kilometers along strike of the main LP zone, returned encouraging results, indicating high-grade mineralization beyond the current resource base.

Speaker #6: Drilling on the broader land package outside of the main LP trend also returned encouraging results. We will progress additional drilling to follow up on these results along trend and on the broader land package this year.

Speaker #6: I will now hand it over to Jeff to discuss the permitting progress at Great Bear.

Speaker #1: Thanks, Will. Permitting of the AX program and the main project continue to advance as we work hand in hand with the Ontario and federal authorities.

Geoffrey P. Gold: Thanks, Will. Permitting of the AEX program and the main project continue to advance as we work hand in hand with the Ontario and federal authorities. Focusing on AEX, we continue to work with the Ontario Ministry of Environment, Conservation and Parks to finalize the 2 remaining AEX permits. We anticipate receiving these permits and to commence construction of the decline by Q2 of this year. Turning to the main project, which remains on schedule, work has commenced on both federal and provincial permits. Federally, we continue to work with the Impact Assessment Agency of Canada, IAAC, to advance the project impact statement. The first 2 of 3 phase submissions for the project's impact statement were filed on time in September and December, respectively. The third and final phase is scheduled to be submitted at the end of Q1 of this year, as previously noted.

Geoffrey P. Gold: Thanks, Will. Permitting of the AEX program and the main project continue to advance as we work hand in hand with the Ontario and federal authorities. Focusing on AEX, we continue to work with the Ontario Ministry of Environment, Conservation and Parks to finalize the 2 remaining AEX permits. We anticipate receiving these permits and to commence construction of the decline by Q2 of this year. Turning to the main project, which remains on schedule, work has commenced on both federal and provincial permits. Federally, we continue to work with the Impact Assessment Agency of Canada, IAAC, to advance the project impact statement. The first 2 of 3 phase submissions for the project's impact statement were filed on time in September and December, respectively. The third and final phase is scheduled to be submitted at the end of Q1 of this year, as previously noted.

Speaker #1: Focusing on AX, we continue to work with the Ontario Ministry of Environment, Conservation and Parks to finalize the two remaining AX permits. We anticipate receiving these permits and commencing construction of the decline by Q2 of this year.

Speaker #1: Turning to the main project, which remains on schedule, work has commenced on both federal and provincial permits. Federally, we continue to work with the Impact Assessment Agency of Canada (IAC) to advance the project impact statement.

Speaker #1: The first two of three-phase submissions for the project's impact statement were filed on time in September and December, respectively. The third and final phase is scheduled to be submitted at the end of Q1 of this year, as previously noted.

Speaker #1: As a reminder, finalizing the impact statement and receiving the final impact assessment report from IAC is the critical first step to obtaining the other federal and provincial permits we require to construct and operate the Great Bear mine.

Geoffrey P. Gold: As a reminder, finalizing the impact statement and receiving the final impact assessment report from IAAC is the critical first step to obtaining the other federal and provincial permits we require to construct and operate the Great Bear Mine.

Geoffrey P. Gold: As a reminder, finalizing the impact statement and receiving the final impact assessment report from IAAC is the critical first step to obtaining the other federal and provincial permits we require to construct and operate the Great Bear Mine.

J. Paul Rollinson: ... Work has also commenced on other main project federal permits, with technical documents submitted to Fisheries and Oceans Canada and Environment and Climate Change Canada during the quarter. Provincially, we were pleased that the main project was recently designated for the One Project, One Process permitting framework by the Ontario Minister of Energy and Mines, Steven Lecce. This helpful initiative aims to better coordinate, integrate, and streamline Ontario mining project authorizations, permitting, and Indigenous community consultation, which we support. We expect this more coordinated framework will facilitate the Ontario component of Great Bear permitting and targeted first gold production later in 2029. Respecting Indigenous communities, we continue to advance the negotiation of benefits agreements in a constructive and positive manner. I will now turn it back to Will to discuss our exploration portfolio.

Geoffrey P. Gold: ... Work has also commenced on other main project federal permits, with technical documents submitted to Fisheries and Oceans Canada and Environment and Climate Change Canada during the quarter. Provincially, we were pleased that the main project was recently designated for the One Project, One Process permitting framework by the Ontario Minister of Energy and Mines, Steven Lecce. This helpful initiative aims to better coordinate, integrate, and streamline Ontario mining project authorizations, permitting, and Indigenous community consultation, which we support. We expect this more coordinated framework will facilitate the Ontario component of Great Bear permitting and targeted first gold production later in 2029. Respecting Indigenous communities, we continue to advance the negotiation of benefits agreements in a constructive and positive manner. I will now turn it back to Will to discuss our exploration portfolio.

Speaker #1: Work has also commenced on other main project federal permits with technical documents submitted to fisheries and oceans Canada and environment and climate change Canada during the quarter.

Speaker #1: Provincially, we were pleased that the main project was recently designated for the one project, one process permitting framework by the Ontario Minister of Energy and Mines, Stephen Lechier.

Speaker #1: This helpful initiative aims to better coordinate, integrate, and streamline Ontario mining project authorizations, permitting, and indigenous community consultation. Which we support.

Speaker #2: We expect this more coordinated framework will facilitate the Ontario component of Great Bear permitting and targeted first gold production later in 2029. Respecting indigenous communities, we continue to advance the negotiation of benefits agreements in a constructive and positive manner.

Speaker #2: I will now turn it back to Will to discuss our exploration portfolio.

Speaker #3: Thanks, Jeff. Beyond the significant portfolio of projects under study, permitting and construction that already sit in our resource base, we are also actively progressing brownfields and greenfields explorations across the portfolio.

William D. Dunford: Thanks, Jeff. Beyond the significant portfolio of projects under study, permitting, and construction that already sit in our resource base, we are also actively progressing Brownfields Exploration and Greenfields Exploration across the portfolio, with a total $185 million budget in 2026. We had a strong year of Brownfields Exploration, driving both the significant reserve additions we spoke about earlier and identification of additional resource potential across a number of projects, a few of which I will now highlight. First, at Tasiast, we have continued to see positive results at West Branch, with 2025 deep drilling demonstrating that mineralization continues at least 1.8 kilometers down plunge of our existing underground resource.

William D. Dunford: Thanks, Jeff. Beyond the significant portfolio of projects under study, permitting, and construction that already sit in our resource base, we are also actively progressing Brownfields Exploration and Greenfields Exploration across the portfolio, with a total $185 million budget in 2026. We had a strong year of Brownfields Exploration, driving both the significant reserve additions we spoke about earlier and identification of additional resource potential across a number of projects, a few of which I will now highlight. First, at Tasiast, we have continued to see positive results at West Branch, with 2025 deep drilling demonstrating that mineralization continues at least 1.8 kilometers down plunge of our existing underground resource.

Speaker #3: With a total of 185 million dollar budget in 2026. We had a strong year of brownfields exploration driving both the significant reserve additions we spoke about earlier and identification of additional resource potential across a number of projects, a few of which I will now highlight.

Speaker #3: First, at Tasias, we have continued to see positive results at West Branch, with 2025 deep drilling demonstrating that mineralization continues at least 1.8 kilometers down plunge of our existing underground resource.

Speaker #3: Next, in Alaska, the team spent 2025 building on our knowledge of the Gill satellite deposit at Fort Knox. Alongside opportunity drilling near the Fort Knox pit to enhance the optionality of our next layback.

William D. Dunford: Next, in Alaska, the team spent 2025 building on our knowledge of the Gil satellite deposit at Fort Knox, alongside opportunity drilling near the Fort Knox pit to enhance the optionality of our next layback. Results at Gil were encouraging, with a few highlight intercepts shown on the slide, with strong grades and widths, including a 15.2 g/t intercept over more than 4 meters. Gil is a satellite opportunity with potential to augment production for future phases of the Fort Knox main pit. As a last highlight, at Bald Mountain, efforts have continued to explore our large land package at the site, and we're successful in bringing in the 200,000-ounce reserve add I mentioned earlier, primarily through satellite pit extensions.

William D. Dunford: Next, in Alaska, the team spent 2025 building on our knowledge of the Gil satellite deposit at Fort Knox, alongside opportunity drilling near the Fort Knox pit to enhance the optionality of our next layback. Results at Gil were encouraging, with a few highlight intercepts shown on the slide, with strong grades and widths, including a 15.2 g/t intercept over more than 4 meters. Gil is a satellite opportunity with potential to augment production for future phases of the Fort Knox main pit. As a last highlight, at Bald Mountain, efforts have continued to explore our large land package at the site, and we're successful in bringing in the 200,000-ounce reserve add I mentioned earlier, primarily through satellite pit extensions.

Speaker #3: Results at Gill were encouraging, with a few highlight intercepts shown on the slide, a strong grades and widths, including a 15.2 gram per ton intercept, over more than four meters.

Speaker #3: Gill is a satellite opportunity with potential to augment production for future phases of the Fort Knox main pit. And as a last highlight, at Bald Mountain, efforts have continued to explore our large land package at the site and were successful at bringing in the 200,000 ounce reserve ad I mentioned earlier, primarily through satellite pit extensions.

Speaker #3: We have also seen strong results outside of those satellite pits, that were added to reserves as part of the Red Bird II project. One highlight was the drilling at the Rad satellite pit, which saw intercepts with significant grades and widths, including 10 grams per ton, over 16 meters.

William D. Dunford: We have also seen strong results outside of those satellite pits that were added to reserves as part of the Redbird 2 project. One highlight was the drilling at the Rat satellite pit, which saw intercepts with significant grades and widths, including 10 grams per ton over 16 meters. Rat is one of more than 40 historic mining areas on the property and will be a focus to explore and study for potential to complement our next anticipated anchor pit at Bald Mountain, the Top Pit. You can find more details on the strong results from our 2025 brownfields program and our plans for 2026 in our press release. Moving to our greenfields program, we completed approximately 40 kilometers of drilling across targets in Canada, the US, and Finland. In Canada, exploration was primarily focused in Manitoba, New Brunswick, and Ontario.

William D. Dunford: We have also seen strong results outside of those satellite pits that were added to reserves as part of the Redbird 2 project. One highlight was the drilling at the Rat satellite pit, which saw intercepts with significant grades and widths, including 10 grams per ton over 16 meters. Rat is one of more than 40 historic mining areas on the property and will be a focus to explore and study for potential to complement our next anticipated anchor pit at Bald Mountain, the Top Pit. You can find more details on the strong results from our 2025 brownfields program and our plans for 2026 in our press release. Moving to our greenfields program, we completed approximately 40 kilometers of drilling across targets in Canada, the US, and Finland. In Canada, exploration was primarily focused in Manitoba, New Brunswick, and Ontario.

Speaker #3: Rad is one of more than 40 historic mining areas on the property, and will be a focus to explore and study for potential to complement our next anticipated anchor pit at Bald Mountain, the top pit.

Speaker #3: You can find more details on the strong results from our 2025 brownfields program and our plans for 2026 in our press release. Moving to our greenfields program, we completed approximately 40 kilometers of drilling across targets in Canada, the U.S., and Finland.

Speaker #3: In Canada, exploration was primarily focused in Manitoba, New Brunswick, and Ontario. At Snow Lake in Manitoba, we saw exciting new results, both from our first drill program on the McCafferty property including an intercept of four meters at 34 grams per ton, and from grav sampling on the SLG property, which returned a number of results with strong gold grades.

William D. Dunford: At Snow Lake in Manitoba, we saw exciting new results, both from our first drill program on the McCafferty property, including an intercept of 4 meters at 34 grams per ton, and from grab sampling on the SLG property, which returned a number of results with strong gold grades. These properties further complement the high-grade vein system we have outlined at Laguna North, providing critical mass to support further exploration work in the area. In New Brunswick, work consisted of mapping and drilling on the Williams Brook JV property, where gold-rich quartz veins were identified at the link cell. At Red Lake North in Ontario, field work also identified several high-grade quartz veins, and rock grab samples returned numerous strong grades, with the highest assay returning 65 grams per ton. In Nevada, we completed 2 drill holes at the TWC JV project to test for lower plate Carlin-type host rocks.

William D. Dunford: At Snow Lake in Manitoba, we saw exciting new results, both from our first drill program on the McCafferty property, including an intercept of 4 meters at 34 grams per ton, and from grab sampling on the SLG property, which returned a number of results with strong gold grades. These properties further complement the high-grade vein system we have outlined at Laguna North, providing critical mass to support further exploration work in the area. In New Brunswick, work consisted of mapping and drilling on the Williams Brook JV property, where gold-rich quartz veins were identified at the link cell. At Red Lake North in Ontario, field work also identified several high-grade quartz veins, and rock grab samples returned numerous strong grades, with the highest assay returning 65 grams per ton. In Nevada, we completed 2 drill holes at the TWC JV project to test for lower plate Carlin-type host rocks.

Speaker #3: These properties further complement the high-grade vein system we have outlined at Laguna North, providing critical mass to support further exploration work in the area.

Speaker #3: In New Brunswick, work consisted of mapping and drilling on the Williamsbrook JV property, where gold-rich quartz veins were identified at the link zone. At Red Lake North in Ontario, fieldwork also identified several high-grade quartz veins and rock grav samples returned numerous strong grades, with the highest assay returning 65 grams per ton.

Speaker #3: In Nevada, we completed two drill holes at the PWC JV project to test for lower plate garland-type post drops. Program returned 149-meter mineralized intercept confirming the presence of garland-type disseminated gold, and work this year will focus on following up on this exciting result.

William D. Dunford: The program returned a 149-meter mineralized intercept, confirming the presence of Carlin-type disseminated gold, and work this year will focus on following up on this exciting result. We continue to be encouraged by our success identifying earlier-stage brownfields and greenfields opportunities to progress into our resource base and projects pipeline, and plan to build on this success in 2026. I will now turn it back to Paul for closing remarks.

William D. Dunford: The program returned a 149-meter mineralized intercept, confirming the presence of Carlin-type disseminated gold, and work this year will focus on following up on this exciting result. We continue to be encouraged by our success identifying earlier-stage brownfields and greenfields opportunities to progress into our resource base and projects pipeline, and plan to build on this success in 2026. I will now turn it back to Paul for closing remarks.

Speaker #3: We continue to be encouraged by our success identifying earlier-stage brownfields and greenfields opportunities to progress into our resource base and project's pipeline. We plan to build on this success in 2026.

Speaker #3: I will now turn it back to Paul for closing remarks.

Speaker #2: Thanks, Will. After delivering on our commitments in 2025, we are well positioned for a strong 2026. Our business is in great shape, both operationally upcoming catalysts for the year ahead, including ongoing return of capital through our dividend and share repurchases, continued strengthening of our balance sheet supported by strong operational performance and cash flow generation, advancing our project's pipeline, including the US projects discussed in January, as well as Great Bear and Lobo Marte, which we intend to provide a project update later on this year, and continued exploration intended to bring in new projects and mine life extensions.

J. Paul Rollinson: Thanks, Will. After delivering on our commitments in 2025, we are well positioned for a strong 2026. Our business is in great shape, both operationally and financially, with a number of upcoming catalysts for the year ahead, including ongoing return of capital through our dividend and share repurchases, continued strengthening of our balance sheet, supported by strong operational performance and cash flow generation, advancing our projects pipeline, including the US projects discussed in January, as well as Great Bear and Lobo-Marte, which we intend to provide a project update later on this year, and continued exploration intended to bring in new projects and mine life extensions. Looking forward, we are excited about our future. We have a strong production profile. We are generating significant free cash flow. We have an excellent balance sheet. We have an attractive return of capital.

Paul Rollinson: Thanks, Will. After delivering on our commitments in 2025, we are well positioned for a strong 2026. Our business is in great shape, both operationally and financially, with a number of upcoming catalysts for the year ahead, including ongoing return of capital through our dividend and share repurchases, continued strengthening of our balance sheet, supported by strong operational performance and cash flow generation, advancing our projects pipeline, including the US projects discussed in January, as well as Great Bear and Lobo-Marte, which we intend to provide a project update later on this year, and continued exploration intended to bring in new projects and mine life extensions. Looking forward, we are excited about our future. We have a strong production profile. We are generating significant free cash flow. We have an excellent balance sheet. We have an attractive return of capital.

Speaker #2: Looking forward, we are excited about our future. We have a strong production profile, we are generating significant free cash flow, we have an excellent balance sheet, we have an attractive return of capital, we have an exciting pipeline of both exploration and development opportunities, and we are very proud of our commitment to responsible mining that continues to make us a leader in sustainability.

J. Paul Rollinson: We have an exciting pipeline of both exploration and development opportunities, and we are very proud of our commitment to responsible mining-

Paul Rollinson: We have an exciting pipeline of both exploration and development opportunities, and we are very proud of our commitment to responsible mining-

Geoffrey P. Gold: ... that continues to make us a leader in sustainability. With that, operator, I'd like to open up the line for questions.

Paul Rollinson: ... that continues to make us a leader in sustainability. With that, operator, I'd like to open up the line for questions.

Speaker #2: Thank you, operator. I'd like to open up the line for questions.

Speaker #4: At this time, I would like to remind everyone in order to ask a question, please press star, then the number one on your telephone keypad.

Operator: At this time, I would like to remind everyone, in order to ask a question, please press Star then the number 1 on your telephone keypad. We will pause for just a moment to compile the Q&A roster. Your first question comes from the line of Sahad Tariq with Jefferies. Your line is open.

Operator: At this time, I would like to remind everyone, in order to ask a question, please press Star then the number 1 on your telephone keypad. We will pause for just a moment to compile the Q&A roster. Your first question comes from the line of Sahad Tariq with Jefferies. Your line is open.

Speaker #4: We will pause for just a moment to compile the Q&A roster. Your first question comes from the line of Fahad Tariq with Jeffrey's, your line is open.

Speaker #5: Hi, thanks for taking my question. On Great Bear, the one project, one process designation, I believe Kinross is the first major mining company to receive that.

[Analyst] (Jefferies): Hi, thanks for taking my question. On Great Bear, the One Project One Process designation, I believe Kinross is the first major mining company to receive that. Can you maybe talk about the relationship with the provincial government and whether this could help get Great Bear into the Major Projects Office designation at the federal level? Thanks.

Fahad Tariq: Hi, thanks for taking my question. On Great Bear, the One Project One Process designation, I believe Kinross is the first major mining company to receive that. Can you maybe talk about the relationship with the provincial government and whether this could help get Great Bear into the Major Projects Office designation at the federal level? Thanks.

Speaker #5: Can you maybe talk about the relationship with the provincial government and whether this could help get Great Bear into the major projects office designation at the federal level?

Speaker #5: Thanks.

Speaker #2: Yeah, sure. It's Jeff. I'll take that question. Look, let me start by saying that we were pleased by the Ontario Minister of Energy and Mines' decision to designate the Great Bear project for inclusion in the 1P1P process.

Geoffrey P. Gold: Yeah, sure. It's Geoff Gold. I'll take that question. Look, let me start by saying that we were pleased by the Ontario Ministry of Energy and Mines decision to designate the Great Bear project for inclusion in the 1P1P process. And, you know, we believe this designation represents an important milestone. I'm gonna talk about both processes, but at the 1P1P level, the main benefit of the designation is a more streamlined and integrated approach for the provincial component of mine project permitting. And it gives us a single point of contact at the Ontario Ministry of Energy and Mines to coordinate all required provincial authorizations, permitting, and First Nations consultation.

Geoffrey P. Gold: Yeah, sure. It's Geoff Gold. I'll take that question. Look, let me start by saying that we were pleased by the Ontario Ministry of Energy and Mines decision to designate the Great Bear project for inclusion in the 1P1P process. And, you know, we believe this designation represents an important milestone. I'm gonna talk about both processes, but at the 1P1P level, the main benefit of the designation is a more streamlined and integrated approach for the provincial component of mine project permitting. And it gives us a single point of contact at the Ontario Ministry of Energy and Mines to coordinate all required provincial authorizations, permitting, and First Nations consultation.

Speaker #2: And we believe this designation represents an important milestone. I would talk about both processes, but at the 1P1P level, the main benefit of the designation is a more streamlined and integrated approach for the provincial component of main project permitting.

Speaker #2: And it gives us a single point of contact at the Ontario Ministry of Energy and Mines to coordinate all required provincial authorizations, permitting, and First Nations consultation.

Speaker #2: And so as a result, we expect that will help facilitate the provincial piece of main project permitting and targeted first goal production in late 2029.

Geoffrey P. Gold: So, as a result, we expect that will help facilitate the provincial piece of main project permitting and targeted first gold production in late 2029. And we've worked hand in hand through this process with the Ministry of Mines and other provincial permitting agencies. And you know, we're pleased with the relationship. It's a strong relationship as we continue to work together to develop the project. On your federal piece of the question, I can tell you that we've been in touch with the Federal Major Projects Office, and they, along with other federal agencies, are aware of the Great Bear project and its potential significant economic and sustainable benefits for not only Ontario, but Canada, and Indigenous communities.

Geoffrey P. Gold: So, as a result, we expect that will help facilitate the provincial piece of main project permitting and targeted first gold production in late 2029. And we've worked hand in hand through this process with the Ministry of Mines and other provincial permitting agencies. And you know, we're pleased with the relationship. It's a strong relationship as we continue to work together to develop the project. On your federal piece of the question, I can tell you that we've been in touch with the Federal Major Projects Office, and they, along with other federal agencies, are aware of the Great Bear project and its potential significant economic and sustainable benefits for not only Ontario, but Canada, and Indigenous communities.

Speaker #2: And we've worked hand in hand through this process with the Ministry of Mines. And other provincial permitting agencies and we're pleased with the relationship.

Speaker #2: It's a strong relationship as we continue to work together, to develop the project. On your federal piece of the question, I can tell you that we've been in touch with the federal major projects office.

Speaker #2: And they, along with other federal agencies, are aware of the Great Bear project and its potential significant economic and sustainable benefits for not only Ontario, but Canada and Indigenous communities.

Speaker #2: And it's absolutely possible to obtain designations under both the 1P1P permitting framework that I talked about previously and the federal national project of interest framework.

Geoffrey P. Gold: It's absolutely possible to obtain designations under both the One Project One Process permitting framework that I talked about previously and the federal national project of interest framework. We've elected, at this juncture, to not apply for that federal designation. We believe that with the benefit of the One Project One Process designation that we currently have, along with the fact, as Paul noted, that we're far enough along with the federal impact assessment process overseen by the Impact Assessment Agency of Canada. As we've told the markets, we will be filing the third and final phase of our impact statement at the end of Q1. We believe we are well positioned for our targeted first gold production in late 2029.

Geoffrey P. Gold: It's absolutely possible to obtain designations under both the One Project One Process permitting framework that I talked about previously and the federal national project of interest framework. We've elected, at this juncture, to not apply for that federal designation. We believe that with the benefit of the One Project One Process designation that we currently have, along with the fact, as Paul noted, that we're far enough along with the federal impact assessment process overseen by the Impact Assessment Agency of Canada. As we've told the markets, we will be filing the third and final phase of our impact statement at the end of Q1. We believe we are well positioned for our targeted first gold production in late 2029.

Speaker #2: But we've elected at this juncture to not apply for that federal designation. We believe that with the benefit of the 1P1P designation that currently have, along with the fact as Paul noted that we're far enough along with the federal impact assessment process overseen by IAC, as we've told the markets, we'll be filing the third and final phase of our impact statement at the end of Q1.

Speaker #2: So we believe we are well positioned for our targeted first goal production in late 2029.

Speaker #5: Great, appreciate the detailed response. That's very clear. And then maybe just switching gears to 2026 cost guidance, can you just break out the impact of the royalties—the higher royalties because of the higher gold price—and underlying cost inflation?

[Analyst] (Jefferies): Great. Appreciate the detailed response. That's very clear. Then maybe just switching gears to 2026 cost guidance. Can you just break out the impact of the royalties, the higher royalties because of the higher gold price and underlying cost inflation? Thanks.

Fahad Tariq: Great. Appreciate the detailed response. That's very clear. Then maybe just switching gears to 2026 cost guidance. Can you just break out the impact of the royalties, the higher royalties because of the higher gold price and underlying cost inflation? Thanks.

Speaker #5: Thanks.

Speaker #3: Sure. I can take that as Andrea. I'll start with talking about all and sustaining costs. So our total all and sustaining cost guidance is up about 10% over 2025.

Andrea S. Freeborough: Sure, I can take that. It's Andrea. I'll start with talking about all-in sustaining costs. So our total all-in sustaining cost guidance is up about 10% over 2025, and most of that is related to those two items, so inflation and higher royalties on gold price. So 5% of the 10% increase, 5% is inflation and 4% is royalties from using a $4,500 gold price versus where we were for 2025. And then there's about a 1% increase that's left, and that's just really puts and takes across the portfolio on mine plant sequencing. When we look at cash costs, there's a bigger increase, so the increase looks like 20% year-over-year.

Andrea Freeborough: Sure, I can take that. It's Andrea. I'll start with talking about all-in sustaining costs. So our total all-in sustaining cost guidance is up about 10% over 2025, and most of that is related to those two items, so inflation and higher royalties on gold price. So 5% of the 10% increase, 5% is inflation and 4% is royalties from using a $4,500 gold price versus where we were for 2025. And then there's about a 1% increase that's left, and that's just really puts and takes across the portfolio on mine plant sequencing. When we look at cash costs, there's a bigger increase, so the increase looks like 20% year-over-year.

Speaker #3: And most of that is related to those two items, so inflation and higher royalties on gold price. So of the 10% increase, 5% is inflation and 4% is royalties from using the 4,500 gold price versus where we were for 2025.

Speaker #3: And then there's about a 1% increase that's left, and that's just really puts and takes across the portfolio on mine plant sequencing. When we look at cash costs, there's a bigger increase.

Speaker #3: So they increase looks like 20% year over year. So half of that 20% is the inflation and royalties. And the other half is sequencing as well.

Andrea S. Freeborough: So half of that 20% is the inflation and royalties, and the other half is sequencing as well. There's a bit of a different impact there that's kind of accounting characterization of our stripping costs. We started to see this, thought of starting kind of second half of last year, where stripping costs moved from being characterized as sustaining capital at some of our assets into operating costs. So we see the increase in cash costs, but the offset of that is in sustaining capital. So that's why there's no impact or a very small impact on the all-in sustaining cost guidance. I'd say overall, we're moving the same time. It's just the characterization of cost shows up differently.

Andrea Freeborough: So half of that 20% is the inflation and royalties, and the other half is sequencing as well. There's a bit of a different impact there that's kind of accounting characterization of our stripping costs. We started to see this, thought of starting kind of second half of last year, where stripping costs moved from being characterized as sustaining capital at some of our assets into operating costs. So we see the increase in cash costs, but the offset of that is in sustaining capital. So that's why there's no impact or a very small impact on the all-in sustaining cost guidance. I'd say overall, we're moving the same time. It's just the characterization of cost shows up differently.

Speaker #3: There's a bit of a different impact there that's kind of accounting characterization of our stripping costs. We started to see this sort of starting kind of second half of last year where stripping costs moved from being characterized as sustaining capital at some of our assets into operating costs.

Speaker #3: So we see the increase in cash costs, but the offset of that is in sustaining capital. So that's why there's no impact or a very small impact on the all and sustaining cost guidance.

Speaker #3: I'd say overall, we're moving the same times. It's just the characterization of cost shows up differently.

Speaker #5: Okay, great. Thank you very much.

[Analyst] (Jefferies): Okay, great. Thank you very much.

Fahad Tariq: Okay, great. Thank you very much.

Speaker #4: Your next question comes from the line of Daniel Major with UBS. Your line is open.

Operator: Your next question comes from the line of Daniel Major with UBS. Your line is open.

Operator: Your next question comes from the line of Daniel Major with UBS. Your line is open.

Daniel Major: Hi, and thanks, thanks so much for the presentation. First question, just on the capital allocation, and cash returns going forward. I mean, I think it's great that you're anchoring a capital return to free cash flow, going forward. But I suppose, you know, two parts to the question. Is there a preference, or can you comment on the split between, ongoing buybacks and potential special dividends to get to the 40% of free cash, capital return. And then 40% of free cash flow with a $1 billion net cash position implies you're gonna continue to build, net cash. What are you gonna use that for? And is there a maximum limit above which you'd pay it all out to shareholders?

Daniel Major: Hi, and thanks, thanks so much for the presentation. First question, just on the capital allocation, and cash returns going forward. I mean, I think it's great that you're anchoring a capital return to free cash flow, going forward. But I suppose, you know, two parts to the question. Is there a preference, or can you comment on the split between, ongoing buybacks and potential special dividends to get to the 40% of free cash, capital return. And then 40% of free cash flow with a $1 billion net cash position implies you're gonna continue to build, net cash. What are you gonna use that for? And is there a maximum limit above which you'd pay it all out to shareholders?

Speaker #6: Hi, and thanks very much for the presentation. First question just on the capital allocation and cash returns going forward. I mean, I think it's great that you're anchoring a capital return to free cash flow.

Speaker #6: Going forward, I suppose there are two parts to the question. Is there a preference, or can you comment on the split between ongoing buybacks and potential special dividends to get to the 40% of free cash capital return?

Speaker #6: And then 40% of free cash flow with a billion dollar net cash position implies you're going to continue to build net cash. What are you going to use that for?

Speaker #6: And is there a maximum limit above which you'd pay it all out to shareholders?

J. Paul Rollinson: Why don't I start, Andrea can jump in. To the first part of the question, we have a baseline dividend, which is meant to be there forever. And the bulk of the return of capital really comes in the form of the buyback. We like the buyback. We think a lot of our investors prefer the buyback. And one of the things we like about the buyback is, it does come with that benefit of reducing our share count and therefore, improving our per share metric. We reduced our share count last year, and our intention is to do that again this year. So in terms of the preference between dividend and buyback, we'll do both, but the greater volume or total of cash will be returned through the form of the buyback.

Paul Rollinson: Why don't I start, Andrea can jump in. To the first part of the question, we have a baseline dividend, which is meant to be there forever. And the bulk of the return of capital really comes in the form of the buyback. We like the buyback. We think a lot of our investors prefer the buyback. And one of the things we like about the buyback is, it does come with that benefit of reducing our share count and therefore, improving our per share metric. We reduced our share count last year, and our intention is to do that again this year. So in terms of the preference between dividend and buyback, we'll do both, but the greater volume or total of cash will be returned through the form of the buyback.

Speaker #2: Why don't I start and Andrea can jump in. The first part of the question we have a baseline dividend. Which is meant to be there forever.

Speaker #2: And the bulk of the return of capital really comes in the form of the buyback. We like the buyback. We think a lot of our investors prefer the buyback.

Speaker #2: And one of the things we like about the buyback is it does come with that benefit of reducing our share count and, therefore, improving our per share metric.

Speaker #2: We reduced our share count last year, and our intention is to do that again this year. So, in terms of the preference between dividend and buyback, we'll do both.

Speaker #2: But the greater volume or total of cash will be returned through the form of the buyback. Looking forward, I think our focus is to get the appropriate return of capital and that's why, as you acknowledge, we focused on a percentage of free cash flow.

J. Paul Rollinson: Looking forward, you know, I think our focus is to get the appropriate return of capital. And, and that's why, as you acknowledge, we focused on a percentage of free cash flow. That is the focal point. We do realize that, in the context of current prices, that will be more cash flow, and therefore more returns than we had last year. We are increasing. But at the same time, we're reinvesting in our business. We do expect, in the context of spot, that our balance sheet will continue to strengthen. I, I guess the point there is, we also have to look, look at the other side of it. With these higher gold prices, as we've already seen, we expect higher royalties, higher taxes.

Paul Rollinson: Looking forward, you know, I think our focus is to get the appropriate return of capital. And, and that's why, as you acknowledge, we focused on a percentage of free cash flow. That is the focal point. We do realize that, in the context of current prices, that will be more cash flow, and therefore more returns than we had last year. We are increasing. But at the same time, we're reinvesting in our business. We do expect, in the context of spot, that our balance sheet will continue to strengthen. I, I guess the point there is, we also have to look, look at the other side of it. With these higher gold prices, as we've already seen, we expect higher royalties, higher taxes.

Speaker #2: That is the focal point. We do realize that in the context of current prices, that will be more cash flow and therefore more returns than we had last year.

Speaker #2: So we are increasing. But at the same time, we're reinvesting in our business. We do expect in the context of spot that our balance sheet will continue to strengthen.

Speaker #2: But I guess the point there is we also have to look at the other side of it. With these higher gold prices, as we've already seen, we expect higher royalties, higher taxes, we just demonstrated with the announcement on the US projects.

J. Paul Rollinson: We just demonstrated with the announcement on the US projects; we've got lots of optionality in our pipeline. You know, we'll take a sort of a steady as she goes with the balance sheet while reinvesting in our business with the appropriate return of capital. You know, expecting that we may have higher taxes, royalties, and opportunities to reinvest in our business.

Paul Rollinson: We just demonstrated with the announcement on the US projects; we've got lots of optionality in our pipeline. You know, we'll take a sort of a steady as she goes with the balance sheet while reinvesting in our business with the appropriate return of capital. You know, expecting that we may have higher taxes, royalties, and opportunities to reinvest in our business.

Speaker #2: We've got lots of optionality in our pipeline. And we'll take a sort of a steady as she goes with the balance sheet. While reinvesting in our business with the appropriate return of capital, expecting that we may have higher taxes royalties and opportunities to reinvest in our business.

Speaker #5: Okay. Thanks. And then, well, I guess maybe a follow-on to that. In terms of the inorganic options, are you kind of optically looking at many opportunities at this point?

Daniel Major: Okay. Thanks. And then... Well, I guess maybe a follow-on to that. In terms of the inorganic options, are you kind of actively looking at many opportunities at this point?

Daniel Major: Okay. Thanks. And then... Well, I guess maybe a follow-on to that. In terms of the inorganic options, are you kind of actively looking at many opportunities at this point?

Speaker #2: Yeah, I would say, and we get the question reasonably frequently. We do have we have a very strong internal technical team. We do look at opportunities, particularly if there's a process.

J. Paul Rollinson: Yeah, I would say we get the question reasonably frequently. We do have a very strong internal technical team. We do look at opportunities, particularly if there's a process, but I would say we're hard markers. We're not under any pressure. When you look at our reserve resource, well, really more of our resource optionality, we've got lots of depth in our organic portfolio. We've given good visibility on our guidance for three years and beyond, so we don't feel under any pressure. And what that means is, if we saw the right thing and we felt it created value, we'd, you know, we'd have a look at it.

Paul Rollinson: Yeah, I would say we get the question reasonably frequently. We do have a very strong internal technical team. We do look at opportunities, particularly if there's a process, but I would say we're hard markers. We're not under any pressure. When you look at our reserve resource, well, really more of our resource optionality, we've got lots of depth in our organic portfolio. We've given good visibility on our guidance for three years and beyond, so we don't feel under any pressure. And what that means is, if we saw the right thing and we felt it created value, we'd, you know, we'd have a look at it.

Speaker #2: But I would say we're hard markers. We're not under any pressure. When you look at our reserve resource really more of our resource optionality.

Speaker #2: We've got lots of depth in our organic portfolio. We've given good visibility on our guidance for three years and beyond. So we don't feel under any pressure.

Speaker #2: And what that means is, if we saw the right thing and we felt it created value, we'd have a look at it. But we certainly don't feel under any pressure.

J. Paul Rollinson: But we certainly don't feel under any pressure, and, you know, we're quite happy with the organic profile as it looks today. As I said, our objective really with the free cash flow is to continue to grow our per share metrics.

Paul Rollinson: But we certainly don't feel under any pressure, and, you know, we're quite happy with the organic profile as it looks today. As I said, our objective really with the free cash flow is to continue to grow our per share metrics.

Speaker #2: And we're not quite happy with the organic profile as it looks today. As I said, we'll our objective really with the free cash flow is to continue to grow our per share metrics.

Speaker #5: Great. Thanks. And then last one for me. First, I think it's useful to change the way of the accounting for the taxpayables. But just on that, in terms of the Q1, now we're past the year-end, what we should be expecting in terms of the cash outflow.

Daniel Major: Great, thanks. And then, last one for me, first, I think it's usefully changed the way of the accounting for the tax payables. But just on that, in terms of the Q1, and now we're past the year and what we should be expecting in terms of the cash outflow, I know you've obviously given the guidance, the cash tax for the full year. And then with respect to the run rates, the capital returns, free cash will be lower in Q1 because of the tax payments. Should we read that you'll slow the buyback, or will you just look to distribute that at a similar rate through the year?

Daniel Major: Great, thanks. And then, last one for me, first, I think it's usefully changed the way of the accounting for the tax payables. But just on that, in terms of the Q1, and now we're past the year and what we should be expecting in terms of the cash outflow, I know you've obviously given the guidance, the cash tax for the full year. And then with respect to the run rates, the capital returns, free cash will be lower in Q1 because of the tax payments. Should we read that you'll slow the buyback, or will you just look to distribute that at a similar rate through the year?

Speaker #5: I know you've obviously given the guidance for cash tax for the full year. And then with respect to the run rates, the capital returns, free cash flow will be lower in Q1 because of the tax payments.

Speaker #5: Would you should we read that you'll slow the buyback or will you just look to distribute that at a similar rate through the year?

Speaker #3: Yeah, as I noted in my remarks, we haven't started the buyback yet just because of the more significant cash outflows in Q1, largely related to tax.

Andrea S. Freeborough: Yeah, we're, as I noted in my remarks, we haven't started the buyback yet, just because of the more significant cash outflows in Q1, largely related to tax, and I'll come back to that. But we are planning to get on the buyback next week. So, you know, on the whole Q1 may be lower than the rest of the year, but given we're targeting 40% of free cash flow for total return on capital, it'll be a bit of a, you know, we'll have to calibrate it as we go throughout the year, and then we'll report back each quarter. Like last year, we do expect to be in the market systematically, sort of daily throughout the year, repurchasing our shares, so.

Andrea Freeborough: Yeah, we're, as I noted in my remarks, we haven't started the buyback yet, just because of the more significant cash outflows in Q1, largely related to tax, and I'll come back to that. But we are planning to get on the buyback next week. So, you know, on the whole Q1 may be lower than the rest of the year, but given we're targeting 40% of free cash flow for total return on capital, it'll be a bit of a, you know, we'll have to calibrate it as we go throughout the year, and then we'll report back each quarter. Like last year, we do expect to be in the market systematically, sort of daily throughout the year, repurchasing our shares, so.

Speaker #3: And I'll come back to that. But we are planning to get on the buyback next week. So on the whole Q1, maybe lower than the rest of the year.

Speaker #3: But given we're targeting the 40% of free cash flow for total return of capital, it'll be a bit of a—we'll have to calibrate it as we go throughout the year.

Speaker #3: And then we'll report back each quarter. Like last year, we do expect to be in the market systematically, sort of daily throughout the year, repurchasing our shares.

Speaker #3: In terms of the tax, tax payments, in Q1, we expect to be paying over $400 million. And that's largely related to 2025. And then we gave the guidance for the full year.

Andrea S. Freeborough: In terms of the tax, tax payments, in Q1, we expect to be paying over $400 million, and that's largely related to 2025. And then we gave the guidance for the full year, but, about, I think $500 million of that is, is related to, to 2025. Sorry, probably closer to $600-

Andrea Freeborough: In terms of the tax, tax payments, in Q1, we expect to be paying over $400 million, and that's largely related to 2025. And then we gave the guidance for the full year, but, about, I think $500 million of that is, is related to, to 2025. Sorry, probably closer to $600-

Speaker #3: But about, I think, $500 million of that is related to 2025. Sorry, probably closer to $600.

Daniel Major: Okay, so $400 million in the first-

Daniel Major: Okay, so $400 million in the first-

Speaker #5: Okay, so $400 million in the first.

Speaker #3: In the first quarter.

Andrea S. Freeborough: In Q1, yeah.

Andrea Freeborough: In Q1, yeah.

Daniel Major: So $400 million in the Q1, and then the remainder of the $1.25 billion, so $850 million over the year. Okay. Great. Thanks a lot.

Daniel Major: So $400 million in the Q1, and then the remainder of the $1.25 billion, so $850 million over the year. Okay. Great. Thanks a lot.

Speaker #5: So $400 million in the first quarter and then the remainder of the 1.25, so 1125 over the year. Okay. Great. Thanks a lot.

Andrea S. Freeborough: Right, with Q4, Q4 typically has sort of the lowest payments, Q1 the highest, then Q2. So more weighted to the first half, and Q1 being the highest.

Andrea Freeborough: Right, with Q4, Q4 typically has sort of the lowest payments, Q1 the highest, then Q2. So more weighted to the first half, and Q1 being the highest.

Speaker #3: Right. We typically had sort of the lowest payments Q1, the highest. Then Q2, so more weighted to the first half and Q1 being the highest.

Speaker #5: Okay. Great. Thanks a lot.

Daniel Major: Okay, great. Thanks a lot.

Daniel Major: Okay, great. Thanks a lot.

Speaker #1: Your next question comes from the line of Carrie McCrory with Canica Genuity. Your line is open.

Operator: Your next question comes from the line of Carey MacRury with Canaccord Genuity. Your line is open.

Operator: Your next question comes from the line of Carey MacRury with Canaccord Genuity. Your line is open.

Speaker #4: Hey, good morning, and congrats on the strong year. Just going back to the 40% target—that's just to clarify—that's for 2026. And that's a number that you'll revisit, I guess, in 2027?

Carey MacRury: Hey, good morning, and congrats on the strong year. Just going back to the 40% target, that's just to clarify, that's for 2026, and that's a number that you'll revisit, I guess, in 2027?

Carey MacRury: Hey, good morning, and congrats on the strong year. Just going back to the 40% target, that's just to clarify, that's for 2026, and that's a number that you'll revisit, I guess, in 2027?

Andrea S. Freeborough: That's right.

Andrea Freeborough: That's right.

Speaker #3: That's right.

Speaker #4: Okay. And then just in terms of the 2 million ounces, is there a quarterly progression we should be expecting or pretty flat quarter to quarter like last year?

Carey MacRury: Okay. And then just in terms of the 2 million ounces, is there a quarterly progression we should be expecting, or pretty flat quarter to quarter, like last year?

Carey MacRury: Okay. And then just in terms of the 2 million ounces, is there a quarterly progression we should be expecting, or pretty flat quarter to quarter, like last year?

Speaker #3: Pretty flat quarter to quarter.

Andrea S. Freeborough: Pretty flat quarter-over-quarter.

Andrea Freeborough: Pretty flat quarter-over-quarter.

Speaker #6: Okay. As Andrea noted, she gave a comment. We like to range sort of consistency. But obviously, at 2 million, divide by 4, that's 500.

Claude Schimper: Okay, as Andrea noted, you know, she gave her comments. We like to range sort of consistency, but obviously at $2 million divided by 4, that's $500, but you have ups and downs. So we think anything, $485 to $515 or $490 to $510, that's kind of the average.

Claude Schimper: Okay, as Andrea noted, you know, she gave her comments. We like to range sort of consistency, but obviously at $2 million divided by 4, that's $500, but you have ups and downs. So we think anything, $485 to $515 or $490 to $510, that's kind of the average.

Speaker #6: But you have ups and downs, so we think anything $485 to $515, or $490 to $510, that's kind of the average.

Speaker #4: Okay. Great. That's it for me. Thanks.

Carey MacRury: Okay, great. That's it for me. Thanks.

Carey MacRury: Okay, great. That's it for me. Thanks.

Speaker #2: Thanks.

Claude Schimper: Thanks.

Paul Rollinson: Thanks.

Speaker #1: Your next question comes from the line of Tanya Jacobs Clinic with Scotiabank. Your line is open.

Operator: Your next question comes from the line of Tanya Jakusconek with Scotiabank. Your line is open.

Operator: Your next question comes from the line of Tanya Jakusconek with Scotiabank. Your line is open.

Tanya Jakusconek: Oh, great. Good morning, everyone. Hello, can you hear me?

Tanya Jakusconek: Oh, great. Good morning, everyone. Hello, can you hear me?

Speaker #7: Oh, great. Good morning, everyone. Hello. Can you hear me?

J. Paul Rollinson: You cut out, Tanya. Just-

Speaker #2: I cut out, Tanya. Just.

Paul Rollinson: You cut out, Tanya. Just-

Claude Schimper: We can hear you now.

Claude Schimper: We can hear you now.

Speaker #6: I can hear you now.

Speaker #7: Yeah. Can you hear me now? Hello?

Tanya Jakusconek: Can you hear me now? Hello.

Tanya Jakusconek: Can you hear me now? Hello.

Speaker #2: Yep.

J. Paul Rollinson: Yeah.

Paul Rollinson: Yeah.

Speaker #7: Yeah. Yep. Okay. Perfect. Great. Thank you for taking my questions. Some have been asked, but just wanted to follow back on just the contract renewals.

Claude Schimper: Yeah.

Claude Schimper: Yeah.

Tanya Jakusconek: Yeah. Yeah. Okay, perfect. Great, thank you for taking my questions. Some have been asked, but just wanted to follow back on just the contract renewals. Are there any other ones that are coming up for renewal this year for your labor contracts that we should be aware of?

Tanya Jakusconek: Yeah. Yeah. Okay, perfect. Great, thank you for taking my questions. Some have been asked, but just wanted to follow back on just the contract renewals. Are there any other ones that are coming up for renewal this year for your labor contracts that we should be aware of?

Speaker #7: Are there any other ones that are coming up for renewal this year for your labor contracts that we should be aware of?

Claude Schimper: Yes, Tanya, there is. We're currently busy working through the Brazil Paracatu contract negotiations. Those are pretty standard, we do them almost annually or 18 months. It's slightly different to the other sites.

Claude Schimper: Yes, Tanya, there is. We're currently busy working through the Brazil Paracatu contract negotiations. Those are pretty standard, we do them almost annually or 18 months. It's slightly different to the other sites.

Speaker #6: Yes, Tanya. There is. We're busy. We're currently busy working through the Brazil Paraca 2 contract negotiations. Those are pretty standard. We do them almost annually or 18 months.

Speaker #6: It's slightly different to the other sites. Yeah, a bit more legislative as well. So it's just a bit more of a process, and that's why it's taken on into this year.

J. Paul Rollinson: A bit more legislated.

Paul Rollinson: A bit more legislated.

Claude Schimper: Yeah, a bit more legislated as well. So it's just a bit more of a process, and that's why it's taken on into this year. But for the rest of the sites, as you know, our US sites, we don't have them. And then it's just Tasiast, Mauritania, which usually we completed, so we're continuing to work for.

Claude Schimper: Yeah, a bit more legislated as well. So it's just a bit more of a process, and that's why it's taken on into this year. But for the rest of the sites, as you know, our US sites, we don't have them. And then it's just Tasiast, Mauritania, which usually we completed, so we're continuing to work for.

Speaker #6: But for the rest of the sites, as you know, our US sites, we don't have them. And then it's just as is tomorrow. Tomorrow, Tanya.

Speaker #6: Until we complete it. So we're continuing to work for it.

Tanya Jakusconek: Okay, and I should be thinking about labor, the inflation, and wage inflation in that 4% to 5%. Would that be fair?

Tanya Jakusconek: Okay, and I should be thinking about labor, the inflation, and wage inflation in that 4% to 5%. Would that be fair?

Speaker #7: Okay. And I should be thinking about labor, the inflation and wage inflation and that 4 to 5 percent. Would that be fair?

Speaker #6: Yeah, it's really relative to the country. Inflation in Mauritania is like 10%. In Brazil, it's about 8%. So it's relative to each country. And then overall for us as a portfolio, it's in the 4 to 5 percent range.

Claude Schimper: Yeah, it's really relative to the country. Right, inflation in Mauritania was, is like 10, Brazil, it's about 8, so it's relative to each country. And then overall for us as a portfolio, it's in the 4 to 5% range.

Claude Schimper: Yeah, it's really relative to the country. Right, inflation in Mauritania was, is like 10, Brazil, it's about 8, so it's relative to each country. And then overall for us as a portfolio, it's in the 4 to 5% range.

Speaker #7: Okay. So it's not out of whack. Okay. Thank you for that. My second question is on Great Bear. And thank you for the information on the permitting side.

Tanya Jakusconek: Okay, so it's not out of line. Okay, thank you for that. My second question is on Great Bear, and thank you for the information on the permitting side. Hopefully, we get that permit in Q2. That'll be good to see. But I read that you're gonna give us an update later in the year on the Great Bear. What exactly are we getting in terms of an update? Is it a, you know, new technical study? Maybe just some clarity on what's coming.

Tanya Jakusconek: Okay, so it's not out of line. Okay, thank you for that. My second question is on Great Bear, and thank you for the information on the permitting side. Hopefully, we get that permit in Q2. That'll be good to see. But I read that you're gonna give us an update later in the year on the Great Bear. What exactly are we getting in terms of an update? Is it a, you know, new technical study? Maybe just some clarity on what's coming.

Speaker #7: Hopefully, we get that permitting Q2. That would be good to see. But I read that you're going to give us an update later in the year on the Great Bear.

Speaker #7: What exactly are we getting in terms of an update? Is it a new technical study, maybe just some clarity on what's coming?

J. Paul Rollinson: Yeah, that may have come out a little bit on the script. The update we're gonna provide is on Lobo-Marte. And we were talking about Great Bear and Lobo at the same time. Just, I don't know that there's a specific update that we're planning. It's just, you know, continued milestones in the case of Great Bear. Getting those two remaining permits, starting the decline, filing the third and final impact assessment filing. You know, so there's not a specific deliverable that I think we're thinking about with Great Bear. In the case of Lobo, we will be filing the EIA, and we plan to give a project update on economics.

Speaker #2: Yeah. Just for kind of that may have come out a little bit on the script. The update we're going to provide is on local Marte.

Paul Rollinson: Yeah, that may have come out a little bit on the script. The update we're gonna provide is on Lobo-Marte. And we were talking about Great Bear and Lobo at the same time. Just, I don't know that there's a specific update that we're planning. It's just, you know, continued milestones in the case of Great Bear. Getting those two remaining permits, starting the decline, filing the third and final impact assessment filing. You know, so there's not a specific deliverable that I think we're thinking about with Great Bear. In the case of Lobo, we will be filing the EIA, and we plan to give a project update on economics.

Speaker #2: And we were talking about Great Bear and Lobo at the same time. I just—I don't know that there's a specific update that we're planning. It's just continued milestones.

Speaker #2: In the case of Great Bear, getting those two remaining permits, starting the decline, filing the third and final impact assessment filing. So there's not a specific deliverable that I think we're thinking about with Great Bear.

Speaker #2: In the case of Lobo, we will be filing the EIA. And we plan to give a project update on economics.

Speaker #6: Right.

Claude Schimper: Right.

Claude Schimper: Right.

Speaker #7: Okay. No, that makes more sense because I was just like, "What's coming on Great Bear that needs an update?" But okay. No, thank you for that clarity.

Tanya Jakusconek: Okay. Now, that makes more sense, 'cause I was just like, "What, what's coming on Great Bear that needs an update?" But okay, no, thank you for that clarity. And then my final question is, there's a slide that I, we talked about, you talked about on some mine life extensions, and Paracatu was there. And I'm just wondering, I mean, years ago, there was a potential to do a layback that would add quite a bit of ounces on Paracatu. Is that what you're still thinking about? Is that something-

Tanya Jakusconek: Okay. Now, that makes more sense, 'cause I was just like, "What, what's coming on Great Bear that needs an update?" But okay, no, thank you for that clarity. And then my final question is, there's a slide that I, we talked about, you talked about on some mine life extensions, and Paracatu was there. And I'm just wondering, I mean, years ago, there was a potential to do a layback that would add quite a bit of ounces on Paracatu. Is that what you're still thinking about? Is that something-

Speaker #7: And then my final question is, there's a slide that we talked about. You talked about on some mine life extensions, and Paraca 2 was there.

Speaker #7: And I'm just wondering, I mean, years ago, there was a potential to do a layback that would add quite a bit of ounces on Paraca 2.

Speaker #7: Is that what you're still thinking about? Is that something?

Claude Schimper: Yeah, you can say that.

Claude Schimper: Yeah, you can say that.

Speaker #6: Yeah.

Tanya Jakusconek: That makes sense?

Tanya Jakusconek: That makes sense?

Speaker #7: That makes sense?

Speaker #6: Yeah. You can see that, I mean, there's a variety of layback optionality. Both in reserve and resource. At Paraca 2, you can see that we put about 700,000 ounces into the reserve this year as it conferred.

Claude Schimper: Yeah, you can see that, I mean, there's a variety of layback optionality, both in reserve and resource at Paracatu. You can see that we put about 700,000 ounces into the reserve this year as a convert.

Claude Schimper: Yeah, you can see that, I mean, there's a variety of layback optionality, both in reserve and resource at Paracatu. You can see that we put about 700,000 ounces into the reserve this year as a convert.

Tanya Jakusconek: Yeah.

Tanya Jakusconek: Yeah.

Claude Schimper: That's material that is now in our strategic business case. That's a further redesign of the layback. So that full reserve is now approved and part of our business case. So it's an easy way to think about the direct business case: the laybacks that sit in the reserve. And then there's also a significant multimillion-ounce resource that we're looking at for the next stage of optionality there.

Claude Schimper: That's material that is now in our strategic business case. That's a further redesign of the layback. So that full reserve is now approved and part of our business case. So it's an easy way to think about the direct business case: the laybacks that sit in the reserve. And then there's also a significant multimillion-ounce resource that we're looking at for the next stage of optionality there.

Speaker #6: That's material that is now in our strategic business plan. And that's a further redesign of the layback. So that full reserve is now approved and part of our business case.

Speaker #6: So it's an easy way to think about the direct business case as the laybacks that sit in the reserve. And then there's also a significant multimillion ounce resource that we're looking at for the next stage of optionality there.

Speaker #7: Okay. Okay. Perfect. Thank you so much. Those are all my questions.

Tanya Jakusconek: Okay. Okay, perfect. Thank you so much. Those are all my questions.

Tanya Jakusconek: Okay. Okay, perfect. Thank you so much. Those are all my questions.

J. Paul Rollinson: Yeah.

Paul Rollinson: Yeah.

Speaker #2: Yeah.

Operator: I will turn the call back over to Paul Rollinson for closing remarks.

Operator: I will turn the call back over to Paul Rollinson for closing remarks.

Speaker #1: I will turn the call back over to Paul Rollinson for closing remarks.

J. Paul Rollinson: Great. Thank you, operator, and thanks everyone for joining us this morning. We look forward to catching up with you all in person in the coming weeks. Thanks for dialing in.

Paul Rollinson: Great. Thank you, operator, and thanks everyone for joining us this morning. We look forward to catching up with you all in person in the coming weeks. Thanks for dialing in.

Speaker #2: Great, thank you, operator. And thanks, everyone, for joining us this morning. We look forward to catching up with you all in person in the coming weeks.

Speaker #2: Thanks for dialing in.

Operator: Ladies and gentlemen, that concludes today's call. Thank you for joining. You may now disconnect.

Operator: Ladies and gentlemen, that concludes today's call. Thank you for joining. You may now disconnect.

Q4 2025 Kinross Gold Corp Earnings Call

Demo

Kinross Gold

Earnings

Q4 2025 Kinross Gold Corp Earnings Call

KGC

Thursday, February 19th, 2026 at 1:00 PM

Transcript

No Transcript Available

No transcript data is available for this event yet. Transcripts typically become available shortly after an earnings call ends.

Want AI-powered analysis? Try AllMind AI →